Browse
Search
Agenda - 09-30-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 09-30-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:18:00 AM
Creation date
9/12/2016 3:02:39 PM
Metadata
Fields
Template:
BOCC
Date
9/30/1985
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22 <br /> SUGGESTED REVISIONS TO <br /> INFRASTRUCTURE REPORT <br /> • <br /> Suggested Revisions. <br /> I-4 Add an asterick to the word "unincorporated'' in Table 1-1 and an addi- <br /> tional footnote which notes "This assumes that muniqipalities will <br /> continue to actiyely annex areas." <br /> I-6 Change Figure 1-3 column headed "water" to indicate inadequate under <br /> Orange County. <br /> 1-8 Add footnote to indicate "E,pture use of bonds by. Orange County will <br /> depend upon the_rate at which school facilities are inspected by growth <br /> in the elementary grades K-6." <br /> 1-12 Make a change in the second paragraph beginning with the third <br /> sentence, to read: Completion of the Cane Creek project will provide <br /> adequate water for southern Ornage County for the period and release of <br /> the Eno River water now used by OWASA will lessen the danger of serious, <br /> water shortage for northern Orange County at this dime. However,, <br /> development of one or more additional sources in northern Orange Cpunty <br /> • - t ' . ' - •r! • x•-. _ • •• •,- • 4 q .• - • . . . • •• • - - <br /> jlnmediate_consideration as even without the OWASA diversion jhere is <br /> inadequate safe yield supply for growth andippjream flpy in the Eno. <br /> River. It should be kept in mind that a lag time of ten years may be <br /> expected between the decision to develop a reservoir and the reservoir <br /> becoming operational. <br /> II-2 Change paragraph 2 to be consistent with I-12. Beginning with the <br /> second sentence the wording should be 'When OWASSA no longer needs ws3ter <br /> wpm Hillsborough, the Eno River, supplementer !?y Late Orange which is <br /> •.i >! • • . •u <br /> • •_. • - -• _ - _. • • • • . , - •• <br /> •st e_ r • d • • • • •- • • to - • • .r <br /> 0 •1 • }- 111 -.�, .—._ ,,-.e - 4, C.rr.a,• . - _• c• - • *4. <br /> periods of normal rainfall. However, in time of drought it is <br /> • - .-i•en •• • • _ c . • ' •II J . <br /> • • !.". •, if • • • 0 - t,• • fl- l! - • :. c <br /> •u t- - • • •. - • • • •.• • • ! • : • r i •u _ . - <br /> Orapgg to downstream users hampers_the County's abilj.ty to menage <br /> scarce supply. Orange County is developing a management plan to <br /> , ..c -. _ . - -• Y' • . - - • • •- - n. _ . • • - • =_•. • <br /> impoundments can hold and_how to bring additional supply seances into <br /> existence. <br /> 11I-58 Sewer. Change; "Estimated cost - Phase II" to Estimated cost -Phase <br /> II thru Phase VI ... $1.59. <br /> III-60 Solid Waste. <br /> After the listing of number of containers add the words: <br /> 4.• . • 0. of the <br /> coup •y a 62 present site smations. <br /> 1I1-60 Education, Change cost estimate to reflect: <br /> Scheduled are <br /> Expanded unit in County system $3.3 <br /> Expanded unit, Chapel Hill/Carrboro 2_3, <br />
The URL can be used to link to this page
Your browser does not support the video tag.