Orange County NC Website
22e <br /> 10 <br /> ILL, Kenyon, resident of Hillsborough, spoke to both the Meng and <br /> Scholar projects. He referred to the question of the availability of water and <br /> sewer services to the projects. He reviewed the history of Town action on <br /> these requests and their discussion of the availability of services. He noted <br /> that the Town Board had been told by Horace Johnson of serious defects due to <br /> water pressure north of Town. He noted that the Town Engineer had been directed <br /> to study* the problem and then submit a solution to the Town Board for <br /> consideration by July, 1985. Be indicated that Horace Johnson had stated that <br /> both.a storage tank and pumping station would be necessary. He continued that <br /> the Board had been informed that it would be 12-18 months after the receipt of <br /> the engineer's report before the solutions posed would be put into effect. Be- <br /> noted there was a postponement in the arrangement with the Town Board. He <br /> • questioned why there would be a shorter period for implementation of a solution <br /> now. He stated that the Town Engineer had brought. a report before the Town <br /> Board in July that indicated that the only feasible solution would be a 300,000 <br /> gallon storage tank at Frank Perry's farm with 8" service lines and <br /> construction of at least one pump station. He noted that the Town Board had <br /> . accepted the report unanimously and called for a 12-18 month delay. He <br /> continued that at the August 12, 1985 meeting of the Town Board discussions <br /> were.- conducted on the possibility that new developments would not worsen the • <br /> • situation and that the Mayor had seemed skeptical of that outcome. He noted <br /> that, as in February, the Town Engineer had not been consulted nor were plans <br /> approved for either development. Be expressed concern about a tentative <br /> promise of service from the Town and asked why the most recent letter from the. <br /> Town was acceptable given that the attorney had advised that previous letters <br /> were unacceptable. He asked that the approvals wait until service was <br /> available and that the projects be considered on the merits of conditions then <br /> prevailing.' <br /> - Vance Brooks, ' resident of the Coleman Loop Road area, expressed <br /> concerns that he had mixed feelings about the project and felt he had received <br /> bad information. <br /> Smith reviewed the development request, citing the density of • <br /> residential use requested. <br /> Brooks asked what type of residential units would be constructed.' <br /> Smith responded that the applicant had not specified the type of units, but had <br /> only indicated that the lots would be moderately priced. <br /> Z-3-85 (REZONING REQUEST) ROBERT A. ANN_RACHEL S. SCHOLAR • <br /> No additional staff presentation was made. <br /> Rick Cannity, agent for the applicant, indicated that his client <br /> wishes to proceed at this time with the project, but would be willing to delay <br /> for more information from the Town of Hillsborough. He cited the "Practice of <br /> Local Government Planning", a manual for planners, which indicated on page 201 <br /> that with the reference to utility services provision, the economics of such <br /> improvements requires the development of property into quarter acre lots, <br /> otherwise the profit margin is marginal. <br /> Cannity cited the recently approved rezoning immediately to the <br /> south in the Town's jurisdiction which is currently under development by the <br /> • applicant. <br /> Kenyon reiterated his previous comments. In addition to his <br /> concerns on the water difficulties he cited problems with the wastewater <br /> treatment plant. He also noted a concern with traffic along US 70 and the <br /> intersection rated by NCDOT as the 37th most dangerous section. <br /> Commissioner Lloyd asked that he clarify which intersection he was <br /> referring to. Kenyon responded the intersection of Corbin and Geer Streets at <br /> the Snake Den. <br /> Commissioner Lloyd indicated he was impressed with the development <br /> by the applicant currently under construction. <br /> �.:; ' • ..• - • ..r -0' •;.j,A- . +- <br /> • <br />