Orange County NC Website
• <br /> 2 <br /> items, along with other items, prompted the Board of Commissioners to continue <br /> the public hearing to allow staff the opportunity to address these concerns. <br /> Approval of the request would allow development of the property for <br /> single family residences on lots containing aminimmm of 20,000 square feet. <br /> Collins listed the issues raised at the June 11, 1985 public hearing as <br /> follows: <br /> Traffic impacts; <br /> Location of road stub-outs; <br /> Location of weaver Dairy Road &pension; <br /> Open space acreage and location; <br /> Pump stations vs. gravity sewer; <br /> Condition of a dam upstream from portions of this proposed <br /> subdivision; <br /> Impact of power lines on residential units; and <br /> Compliance with Orange County floor area ratios. <br /> Collins noted that the applicant has not submitted a revised site plan <br /> that addressed any of these concerns. <br /> In reference to the concern regarding stub-outs within the subdivision <br /> itself, Collins stated that the TOwnivianager and the County Manager suggested <br /> the possibility that a Collector Roads Plan could be developed for this area. <br /> Collins explained the Collector Roads Plan as developed jointly by the Orange <br /> County Planning Staff, the Chapel Hill Planning Staff and Engineering <br /> Department. <br /> Collins noted that condition #6, which originally recommended a 60' <br /> right,of-way, was now increased to a 701 right-,of-way since Sweeten Creek Road <br /> clearly falls under the Orange County designation for collector street. <br /> Another concern noted was the 100' setback provision which is applicable <br /> only in Orange County's jurisdiction. -Collins cited the colored subdivision <br /> naps prepared by staffs and illustrated the range of lot sizes and adjacent <br /> zoning. <br /> The concern about off-street parking within the recreation area was <br /> addressed by recommending ten (10) parking spaces rather than the 2 proposed by <br /> the developer. In regard to the open space requirement, the developer could <br /> either enlarge the existing recreation area to 3.21 acres or he could make a <br /> payment in lieu of open space to the Mown of Chapel Hill in accordance with <br /> Chapel Hill's Development Ordinance to eddress the requirements for the portion <br /> of the property being subdivided in Chapel Hill's jurisdiction. <br /> Both planning staffs considered the impacts of the power line easements <br /> and could find no suitable alternative except to increase the lot sizes where <br /> the power lines cross. The applicant does not wish to revise the site plan so <br /> enlargement of the lots is not an option. Both staffs agreed that given the <br /> location of the power lines and the manner in which they cross the property, <br /> the arrangement that the developer came up with was about the best that could <br /> be done given the circumstances. <br /> Another concern had to do with the Orange County floor area ratios. The <br /> applicant exceeds the total amount of neer area limited by the County's Land <br /> Use Intensity System to about 20,000 square feet. Staff has recommeded that <br /> the applicant comply with the floor area ratio by either staying at or below <br /> the average for all units or by increasing the size of some units while <br /> lowering the size of other units so long as the limitation imposed by the <br /> ordinance is not exceeded. <br /> The next concern addressed by Collins was the condition of a dam located <br /> upstream of portions of the proposed subdivision. There was no opportunity for <br /> staff to check out the condition of the dam.- It is a dam constructed under <br /> auspices of &S, - <br /> In regard-to a gravity system vs. pimp stations, staff has no problem <br /> with the layout proposed by the developer which is the minimum necessary to <br /> serve the project. <br /> Monsimasameasosa.m.m. <br />