Orange County NC Website
. - <br /> 2 <br /> 03S <br /> 10. That easement documents as required by OWASA be recorded before <br /> final plat approval , and that the property owner bear the cost of <br /> any assessments required by OWASA for maintenance of fire hydrants <br /> until such time as this responsibility is assumed by a homeowners <br /> association or a. public entity. <br /> 11. That plans for phasing the development be approved by the Town <br /> Manager- prior to the approval of a Final Plat. <br /> 12. That a stormwater management plan with hydrologic calculations be <br /> approved by the Town Manager before issuance of a Zoning <br /> Compliance Permit. <br /> 13. That final utility plans be approved by the Town. Manager, OWASA, <br /> Duke Power, Southern Bell, and Village Cable before issuance of a <br /> Zoning Compliance Permit. All lines shall be underground. <br /> 14. That a soil erosion and sedimentation control plan be approved by <br /> the Orange County Erosion Control Officer before issuance of a <br /> Zoning Compliance Permit. <br /> 15. That the names of- the development and its streets be approved by <br /> the Town Manager prior to issuance of a Zoning Compliance Permit.. <br /> 16. That the final plat show boundaries of the Resource Conservation <br /> District, and that all lots on the final plat contain (1) a bu.ildable <br /> area outside the Resource Conservation District, and (2) access from <br /> the buildable area to a street without crossing the Resource <br /> Conservation District. <br /> 17.. That a total of 3.21 acres of open space be shown on the final plat; <br /> or, at the applicant's option, a payment in lieu of open space <br /> reservation be made for the difference between open space required <br /> and provided. <br /> 18. That drainage easements be provided through Lots 13, 14 and 18, as <br /> shown on the preliminary plat. <br /> This the 1st day of July, 1985. <br />