Browse
Search
Agenda - 09-10-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 09-10-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:08:54 AM
Creation date
9/12/2016 2:04:46 PM
Metadata
Fields
Template:
BOCC
Date
9/10/1985
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
......____.................. <br /> ! FINDINGS OF THE ORANGE COUNTY PLANNING PEPARTMENT <br /> i ' <br /> j PERTAI N I N'C TO <br /> APPLICATION PO-2-05 CHANDLERO'S GREEN <br /> i <br /> I <br /> :} Planned developments must comply with general and specific standards as set fartll In Article 8 for Special Uses as well as t <br /> set forth in Article 7 for Planned Developments. Article 8.2.# b) requires written finding$ ertifYing compliance with the <br /> J following: r <br /> (i) Specific regulations governing individual Special Uses as set forth 10 Art cle .8 <br /> divided Into two (2) sections which include: 1 These regulations are <br /> (a) Application components; and <br /> (b) Specific standards For Planned Developments (Article 8.8.23 refers to Artiplo 7 standards) <br /> and Special Uses (Article 8.2.4) , <br /> (2) Other requirements as set forth In the Zoning Ordinance, Including tha prflylsiops of Article 5 (Dimensional <br /> Requirements) and Article 6 (Application of Dimenslonal Requirements). <br /> Listed below are the findings of the Orange County Planning Department regarding the applicat#oq In question. The findings <br /> have been presented' by Article and requirement to assist the Planning Board In its deliberations. <br /> j ARTICLES 8.6 AND 8.8 - APPLICATION COMPONENTS ("YES" Indicates compliance; "NO" Indicates noncom fiance) <br /> Planning Staff <br /> ( <br /> Ordinance Fipolpgs Based on Planniing Board <br /> Requirements Subnlltted Applic�ation Evidence Submitted to Support*FlndI"9s Recolumandedt Fladinc <br /> 8.6 - Application submitted on r Yes No Application, narrative and legal description Yes, No <br /> forms providing full and accurate provided. Submittal indiudes <br /> description of preliminary plan; <br /> A proposed use, sign and buffer plan; streets, drailnage and erosion <br /> including location, appearance control plan; -and utility plan. <br /> and operational characteristics <br /> $•8 a} - Tarcpcy siiK copies of the X Yes No 26 copies of the site plan were provided. Site yes No <br /> site plan prepares by a registeved Ian w s <br /> N.C, land surveyor or engineer containing; p. a prepared by Philip Post Associates, P.E. <br /> 1. North point, scale and date X Yes No Sown on the site plan. .. <br /> 2. Extent of area to be developed X Yes No <br /> yes No I <br /> p Shown on the site plan. Yes ' No <br /> 3. Location and width of all ease- .--.. <br /> ments and rights-of-way within <br /> or adjacent to the site X Yes No Shown on the site plan. <br /> YES NO <br />
The URL can be used to link to this page
Your browser does not support the video tag.