Orange County NC Website
MAJ0R SUBDIVISION CHECKLIST <br /> NAME OF SUBDIVISION Wedgewood Section 2 OWNER OR DEVELOPER Apple Creek N <br /> ADDRESS Frazier & Lebanon <br /> TOWNSHIP Cheeks TAX MAP 12 BLOCK LOT P/0 7D <br /> NAME OF SURVEYOR OR ENGINEER ENT Surveys - Steve Yuhasz CA <br /> Total number of lots 4 To be developed in 1 phase(s) , Total number of acres 10. 19 <br /> Typical dwelling units at present or proposed <br /> WATER SUPPLY: Public (Name) Commuuity Individual-x <br /> SEWAGE TREATMENT: Public • Community Individual Septic tank X <br /> SCHOOL DISTRICT Orange ounty FIRE DISTRICT Eland <br /> Access onto State Road #) 1306,1310Road Standard: Public X or Private Class A_ , B X C <br /> Existing critical areas such as streams ( X), Flood prone areas { }, Watershed ( X) , Historic Sites { ) , Other { ) <br /> Explain: Upper Eno Watershed <br /> Land uses in the general area Single Family <br /> SKETCH PLAN RECEIVED (Date) 4-26-85 Approved { X) Recommended Changes ( ) <br /> PRELIMINARY PLAN RECEIVED (Date) 5-31-85 REVISED PRELIMINARY PLAN RECEIVED (Date) <br /> Preliminary Review by Health Department 5-31-85 Erosion Control Officer 6-7- <br /> Keith Rosemond Board of Education 6-10-85 Department of Transportation 6-25-85 <br /> OWASA (if possible) <br /> Other -Mebane (if possible) <br /> -Hillsborough (if possible) <br /> -Orange/Alamance (if possible) <br /> Preliminary Action by the Planning Board Recommended denial 7-15-85 <br /> Preliminary Action by the County Commissioners Approved 8-5-85 <br /> FINAL PLAT RECEIVED (Date) 8-7-85 <br /> { X) All lots were approved by the Health Department <br /> { ) Lots failing Health Departments approval are combined or listed properly on the plat <br /> ( ) Road Maintenance Agreement submitted (where applicable) . Approved <br /> { X) Improvements* have been provided for; completed; bond, letter of credit, cash. Date 6-7-85- <br /> ( ) Final OWASA approval (where applicable) on all. plans & specifications, Date <br /> ( ) Final DOT approval on plat <br /> ( ) Final action by• tfie Planning Board. <br />