Browse
Search
Agenda - 09-03-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 09-03-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:02:55 AM
Creation date
9/12/2016 12:24:37 PM
Metadata
Fields
Template:
BOCC
Date
9/3/1985
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAJOR SUBDIVISION CiiEdQIST <br /> NAME OF SUBDIVISION B. Poe Jr. OWNER OR DEVELOPER C. B. Pope, Jr. <br /> ADDRESS Rt. 1 , Box 373, Cedar Grove, N. C. <br /> TOWNSHIP Cedar Grove TAX MAP_ IS BLOCK LOT 20B <br /> NAME OF SURVEYOR OR ENGINEER Robert A. Jones <br /> Total number of lots _ 5 To be developed in 1 phase(s) , Total number of acres 21 acres <br /> Typical dwelling units at present. 1 or proposed <br /> WATER SUPPLY: Public (Name) Commnuity Individual X <br /> SEWAGE TREATMENT: Public -Community Individual Septic tank X <br /> SCIiOOL DISTRICT FIRE DISTRICT Cedar Grove #2 <br /> Access onto State Road Road Standard: Public X or Private Class A , B C <br /> Existing critical areas such as streams ( X), Flood prone areas { }, Watershed (%), Historic Sites { } , Other { ) <br /> Explain:_ RPfw _Pn to c 3 and 4 Upper Eno Watershed <br /> Land uses in the general area Farming_ and Residential <br /> SKETCH PLAN RECEIVED (Date) Or Approved ( x ) Recommended Changes { ) <br /> PRELIMINARY PLAN RECEIVED {Date) 7-19- 5 REVISED PRELIMINARY PLAN RECEIVED (Date) <br /> Preliminary Review by Health Department 7-25-65 Erosion Control Officer 7-22- 5 MKR <br /> Board of Education x_19_85 Department of Transportation <br /> OWASA (if possible) <br /> Other -Mebane (if possible) <br /> -Hillsborough (if possible) _ <br /> -Orange/Alamance (if possible) <br /> Preliminary Action by the Planning Board Approved 8/19/85 <br /> Preliminary Action by the County Commissioners <br /> FINAL PLAT RECEIVED (_}ate) <br /> { } All lots were approved by the Health Department <br /> ( ) Lots failing Health Departments approval are combined or listed properly on the plat <br /> { ) Road Maintenance Agreement submitted (where applicable) . Approved <br /> ( ) Improvements have been provided for; completed; bond, letter of credit, cash. Date <br /> { ) Final OWASA approval {where applicable) on all plans & specifications, Date <br /> ( ) Final DOT approval on plat <br /> • ' O <br /> ( ) Final action by the Planning Board. ? <br />
The URL can be used to link to this page
Your browser does not support the video tag.