Browse
Search
Agenda - 08-26-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 08-26-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2016 11:23:31 AM
Creation date
9/12/2016 11:57:56 AM
Metadata
Fields
Template:
BOCC
Date
8/26/1985
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
092 • <br /> PHIUP POST <br /> &ASSOCIATES • <br /> ENGMMRS/PLANNES/SURVEMPS <br /> 111 - <br /> Chandler Concrete Co. , Inc. <br /> Hillsborough. N.C. <br /> Page Three <br /> E. Water Circulation: <br /> • <br /> Water is generate from three oistinct sources: <br /> (1) truck wash water. (2) plant run-off water . and (3) storm <br /> run-off. In order to contral the storm water run-oli, from the <br /> plant, three basins are required to hold the water from a 100 <br /> year *storm. Investigating the elevations of the existino <br /> property, the 'run-off flows into the basin as shown. The site - <br /> spot elevations also indicate that the water will not flow to . <br /> any other part of the site. The rain water will flow to the <br /> area shown, which is the lowest area adjacent to the plant. <br /> Water from the railroad ditch will not flow into the basins. <br /> The normal water circulation will occur in the following <br /> • manner. Truck wash: water and plant run-off water will flow into <br /> basin #1 at the-normal rate of 3000 gals. per day. It will take <br /> approximately 11 day i to fill the basin with water to a 4' <br /> level. In this basin all particles will settle to the bottom <br /> and clear water will flow into basin #2. A sump pump is <br /> installed in basin #2 and the Sump pumps the clear water into a <br /> • 111 <br /> 2000 gallon holding tank on the plant side of basin #1 . The <br /> water in the *tank is pumped into the trucks as temper water and <br /> as wash water. Excess water can be used in the plant if <br /> necessary. The water level in basin #2 be no higher than 2' <br /> during normal operation. <br /> During rainy periods the storm water run-off flows from <br /> the plant site into basin #1. settles out the particles and <br /> flows into basin #2. When basin #2 fills up the water <br /> automatically flows into basin #3. The pump is capable of <br /> pumping water from both basins into the holding tank. <br /> • <br /> • <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.