Orange County NC Website
OG4 <br /> 3 . ALL necessary easements to permit utility (electricity , <br /> telephone and cable televisian by any cable television/1k <br /> provider franchised by Orange County and/or Chapel Hill to <br /> serve this development) installation , servicing and hookups to <br /> the development shall be provided at no cost to the utility <br /> provider . Final utility plans shall be approved by the County <br /> Manager end/or applicable utility company prior to the issuance <br /> of a Zoning Compliance Permit , ALL Lines shall be underground . <br /> 4. That a driveway permit be obtained. from NC Department of <br /> Transportation prior to issuance of the Special Use Permit . <br /> S. Roads, parking areas, walkways , utilities; recreation <br /> facilities and sites and Landscaping shall be maintained as <br /> constructed . All such improvements and facilities shall <br /> further be maintained and operated in a safe manner . <br /> S . That all signs be erected in compliance with Article 9 Signs <br /> following issuance of a building permit . No sign may be <br /> erected within the sight triangles for the entranceway to the <br /> development.. <br /> 7 . Grading on the site shall be kept to a minimum . In Lieu of <br /> planted landscaping , existing vegetation shall be maintained <br /> between units . <br /> B. Supplementary base planting shall be installed within the <br /> parking area around the existing specimen trees . <br /> • <br /> 9 . That all structures be erected in compliance with applicable <br /> building codes following submittal for and issuance of building <br /> permits . <br /> 10 . A final boundary survey of the Planned Development and <br /> improvements shall be recorded by the developer . <br /> 11 . The final site plan and narrative of the project , incorporating <br /> all changes, deletions and additions through the final approval <br /> of the project, are to be incorporated herein and made a part <br /> of this Planned Development Special Use Permit . Copies of the <br /> final site plan and narrative are to remain on file with the <br /> Orange County Planning Department . Grading and building <br /> permits , upon application , will be issued after approval and <br /> recordation of the Special Use Permit . <br /> 12. The development shall be built and operated according to the <br /> site plan and written narrative supplied by the developer and <br /> in compliance with the above conditions . <br />