Browse
Search
Agenda - 08-26-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 08-26-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2016 11:23:31 AM
Creation date
9/12/2016 11:57:56 AM
Metadata
Fields
Template:
BOCC
Date
8/26/1985
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.97 <br /> EXISTING ORDINANCE PROVISION(S) : <br /> 6.24.6 Impervious Since Reauetted in Protect d Wt�rsheda <br /> An impervious surface is any surface thorugh which water <br /> cannot penetrate or can only penetrate slowly. This <br /> would include paved streets and parking Lots,, concrete <br /> sidewalks, and structures which cover Land. As a <br /> watershed becomes developed, the amount of impervious <br /> surface increases causing a decrease in soil absorption <br /> oir stormwater and an increase in direct runoff to <br /> streams and water supply impoundments. In order to <br /> promote infiltration of stormwater runoff into the soil <br /> and minimize direct and immediate runoff into streams <br /> and water supply impoundments impervious surface ratios <br /> shall be required as provided in Section 6.23.4. <br /> PROPOSED ORDINANCE AMENDMENTISI : <br /> 6.21.6 Isnaarvious Surface Rag ulated ;n ,, tact d Waters <br /> REVISE heds <br /> An impervious surface is a. surface composed of any <br /> material which impedes or prevents the natural <br /> infiltration of water into the soil. Such surfaces <br /> shalt include, but not be Limited to, streets and <br /> parking areas, sidewalks, patios and structures which <br /> cover the land'. As a watershed becomes developed the <br /> amount of impervious surface increases causing a <br /> decrease in soil absorption of stormwater runoff and an <br /> increase in direct runoff to streams• end other water <br /> bodies resulting in an increase in potential water <br /> pollution. <br /> In order to promote infiltration of stormwater runoff <br /> into the soil and to minimize direct and immediate <br /> runoff into streams and 'water supply impoundments, <br /> impervious eurfece ratios shall be required as provided <br /> in the Table of Impervious Surface Ratios Section <br /> 6.23.4. Impervious surface calculations for an <br /> individual. development shalt be cumulative for original <br /> construction and any subsequent additions and <br /> calculations of impervious surface coverage for <br /> individual Lots shall include that portion of a right- <br /> of—way between the centerline of the street and the edge <br /> the abutting property line of the lot. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.