Browse
Search
Agenda - 08-26-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 08-26-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2016 11:23:31 AM
Creation date
9/12/2016 11:57:56 AM
Metadata
Fields
Template:
BOCC
Date
8/26/1985
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
184 <br /> .Mayor : "'aunt of tU 1 nuug Town Clerk <br /> Frank H.Sheffield'.Jr. Agatha Johnson <br /> *mmissianers HILLSBOROUGH. NORTH.CAROLINA 27278 Shpt. Water Works <br /> wood J. Brown James Pendergraph <br /> Horace H. Johnson �x r Street Supt. <br /> Allen A. Lloyd ��" L. D. Wagoner <br /> Item, J. Smith 0.1 Chief of Ponce <br /> Rachel H. Steens Arnold W. Hamktt <br /> • ++ <br /> :''�i F . Fire Chief <br /> tr 5#4 John Forrest <br /> August 22, 1985 <br /> • <br /> • <br /> Mr. Don Willhoit, Chairman <br /> Orange County Commissioners <br /> 106 E. Margaret Lane • <br /> Hillsborough, N.C. 27278 . <br /> Dear Chairman Willhoit.: <br /> With reference to the County public hearing on August 26th, on behalf of <br /> the Hillsborough Town Board, I would like to reaffirm the willingness of the <br /> Town to provide water and sewer service to the proposed Weng, Scholar, Scnttswood, <br /> and Cornwallis Hills developments, as expressed by the Board at its August 12th <br /> meeting. Letters of tentative approval were issued earlier for each of the <br /> projects, and. we feel that the commitments contained in these letters should be <br /> honored by the Town and County. Our willingness to serve these developments is, <br /> of course, subject to review. and approval of detailed engineering. plans by both <br /> the. Town Engineer and State Division of Health Services. We expect these <br /> engineering reviews to determine whether the proposed developments can be con- <br /> structed in a manner consistent with the Town's current plans to maintain and <br /> improve water pressure to existing customers in the vicinity of the proposed • <br /> new developments. <br /> At its meeting on August 12th, the Town Board adopted a change to the Town's <br /> water and sewer extension policy which requires that all future applications for <br /> water-sewer service be reviewed by the Town Board. This review will be based on <br /> preliminary drawings and other information submitted by a developer with the <br /> application for approval. Under this new procedure, the Town Board will determine <br /> whether to extend water-sewer service to the proposed development, based on con- <br /> sideration of the availability of treatment plant capacity and other potential <br /> impacts of the proposed project. Tentative Board approval, subject to engineering <br /> review and approval, will then be communicated to the County by letter. This <br /> new approval procedure will substitute for the letter approval procedure used <br /> to dace. <br /> IIM <br /> • <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.