Browse
Search
Agenda - 08-05-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 08-05-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 4:22:57 PM
Creation date
9/12/2016 11:01:49 AM
Metadata
Fields
Template:
BOCC
Date
8/5/1985
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
005 <br /> O R A N G E C O U N T Y <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date AUGUST 5. 1985 <br /> Action nda <br /> Item #r(.z <br /> SUBJECT: 1985-1988 SECONDARY ROAD IMPROVEMENTS PROGRAM r <br /> DEPARTMENT: PLANNING PUBLIC HEARING X Yes No <br /> Attachment(s) Information Contact: EDDIE KIRK <br /> PROPOSED 1985-1986 PROGRAM <br /> 1985-86 PRIORITY LIST <br /> RESOLUTION <br /> MAPS <br /> LETTER <br /> Telephone Numbers <br /> Hillsborough — 732-8181 <br /> Durham — 888-7331 <br /> Mebane — 227-2031 <br /> Chapel HiLL — 988-4501 <br /> PURPOSE: To receive citizen input and the Secondary Road Improvements <br /> Advisory Committee recommendation on the 1985-1986 Secondary <br /> Road Improvements Program. <br /> NEED: The NCDOT Board of Transportation is required by law to post a <br /> County map in the Orange County Courthouse showing proposed <br /> annual secondary road improvement projects and to hold a public <br /> hearing jointly with the Board of Commissioners on the proposed <br /> program . <br /> The 1985-86 total allocation for secondary roads is $575,003.00 <br /> a 13% increase in funding from 1984-85. The allocation <br /> includes $120,000 for paved secondary road improvements, the <br /> same amount as 1984-85, $10,500 for spot stabilization of <br /> unpaved roads, an 86% decrease from 1984-85; $394,750 for <br /> paving unpaved roads, a 12% increase from 1984-85; and $49,753 <br /> for contingency, a .7% increase from 1984-85. <br /> The allocation for paving unpaved roads includes: (2) P .O.P. <br /> projects (Saddle Drive and Harper Street) , (7) P .P.P. projects <br /> requiring County participation (Pineview Drive, Pineview Road, <br /> Timberty Road, Moriah Hill Road, Meadow Lane, Roltingwood Road <br /> and Stallings Road) and (2) rural roads (Borland Roand and New <br /> Sharon Church Road) prioritized on the secondary roads priority <br /> paving list . <br />
The URL can be used to link to this page
Your browser does not support the video tag.