Browse
Search
Agenda - 08-05-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 08-05-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 4:22:57 PM
Creation date
9/12/2016 11:01:49 AM
Metadata
Fields
Template:
BOCC
Date
8/5/1985
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
120 <br /> • 9 <br /> PiLkey asked what the DEM requirement was. Chandler <br /> responded that DEM had identified a site for a <br /> reclaiming facility to the west of the plant and had <br /> reviewed the pond sites to the east. <br /> Kizer asked if the ponds are presently located where <br /> DEM wanted them to be Chandler responded that DEM <br /> identified the area, that he had installed the pits <br /> and that DEM had been informed of their installation . <br /> Gordon asked if the ponds were where DEM had <br /> suggested. Chandler responded they were in the <br /> vicinity. <br /> Pilkey asked if DEM knew they were in the railroad <br /> right—of—way. Chandler responded no , the Location was <br /> unclear at the time of DEM comment . He added that <br /> there was runoff before disturbance . <br /> Rhine indicated that DEM had not specified that the <br /> ponds go where they were installed according to a <br /> conversation her niece had had with DEM. The <br /> directive was to install facilities on the western <br /> part of the property . She noted that previously there <br /> was less noise and less of a view. She added that a <br /> stream flows to Byrdsville but that the dumping flows <br /> to Joppa Oaks . <br /> Barbara Page of the Town of Hillsborough inquired <br /> about the dropping of cement onto the highway. <br /> Chandler responded that he had instructed the managers <br /> to clean up any spills immediately . <br /> Chandler cited the March 13, 1985 letter from Fritz <br /> Brunson of Philip Post and Associates regarding <br /> Carolyn McCaskill of DEM comments regarding the <br /> reclaiming facility noting that the time to make <br /> application and submit the drawing was when he was <br /> ready to install the reclaiming facility. Chandler <br /> noted that the Erosion Control Plan showing the ponds <br /> had been submitted and approved. <br /> Gordon stated that new information was available and <br /> that it could be recommended to the Board of <br /> Commissioners to go again to public hearing . <br /> Best inquired what the new information was . Gordon <br /> responded the whole issue of DEM regarding west side <br /> versus east side and runoff. Pearson noted that the <br /> west side is the whole side nearest the railroad. <br />
The URL can be used to link to this page
Your browser does not support the video tag.