Orange County NC Website
108 <br /> • <br /> 2 <br /> 1-10-85 Mr. J. C. Tuttle of Chandler Concrete was advised by a letter <br /> from DEM that they (Chandler Concrete) were illegally <br /> discharging wastewater and that a permit was required. DEM <br /> requested written plans by 2-1-85 for management of wastewater <br /> either by recycling on site or treating and discharging. <br /> 1-17-85 Amaication forms were sent to Chandler by DE}I for discharge and <br /> on sibamanagement of wastewater. <br /> 1-30-85 Chandler responded to DEM and indicated intent to comply with <br /> DEN requirements. <br /> 2-8-85 Major transportation corridor ofiln site plan was submitted to <br /> Orange County Planning Department- <br /> 2-13-85 Chandler received a permit from the Orange County Sedimentation <br /> & Erosion Control Division to clear and grade new site. In con- <br /> junction with clearing and grading site, two retention ponds <br /> were constructed. Chandler planned to recycle water from lower <br /> pond back through concrete plant by use of pumps. This was an <br /> option suggested by DEN but Chandler did not obtain required <br /> state permits. <br /> 2-14-85 MIC site plan approval was issued by the Planning Department in <br /> conjunction with grading and clearing activities permitted by <br /> Sedimentation and Erosion Control Division. <br /> 3-25-85 A citizen's complaint was received by the Orange County Planning <br /> Department concerning Chandler's use of new tract for washing <br /> • and parking concrete trucks. <br /> 4-9-85 Chandler officials met with the Planning Department and were <br /> advised that their use of the new tract was non-conforming since <br /> the use was an extension of their existing 1-3 operation and the <br /> new site was zoned R-1. Washing and parking trucks and run-off <br /> retention were both non-conforming uses. They were advised to <br /> apply for a Land Use Plan amendment and, if successful, <br />