Browse
Search
Agenda - 08-05-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 08-05-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 4:22:57 PM
Creation date
9/12/2016 11:01:49 AM
Metadata
Fields
Template:
BOCC
Date
8/5/1985
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> t008 -2- <br /> •• <br /> ORANGE COUNTY <br /> PROPOSED 1985-1986 SECONDARY <br /> • <br /> ROAD IMPROVEMENT PROGRAM <br /> Map Priority SR • • Estimated <br /> No No. No. Name and Descri.tion Length Cost <br /> , • • <br /> Paving Unpaved Roads <br /> • 1• <br /> 2 1617 Saddle Drive from Durham County Line 0.21 $11,250.00 <br /> to a Dead End <br /> - ; <br /> • <br /> (P. O. P. Paving) <br /> ; <br /> 3 . 2042 Pineview Drive and 0.30 16,000.00 <br /> 2043 Pineview Road <br /> (P. O. P. Paving) <br /> 4 1395 Harper Street from Dixie Avenue North 0.22 11,500.00 <br /> (P. O. P. Paving) <br /> 5 1794 Timberly Road from SR 1734 to a Dead End 0.60 28,500.00 ' <br /> (P. O. P. Paving) <br /> 6 1881 Moriah Hill ,Road from SR 1794 to a Dead End 0.20 6,500.00 <br /> (P. O. P. Paving) <br /> 7 1195 Meadow Lane ,from SR 1104 to a Dead End 0.23 10,000.00 <br /> (P. O. P. Paving) <br /> 8 1194 From SR 1195 to SR. 1112 and 0.47 20,000.00 <br /> 1198 From SR 1194 to a Dead End <br /> (P. O. P. Paving) <br /> 9 1127 BOrland Road from SR 1113 to SR 1102 2.7 20a,0oo.00 <br /> (Complete Funding) <br /> 10 1 1533 New Sharon Church Road from SR 1003 to NC 57 3.0 <br /> 91,000.00 <br /> (Partial Funding) <br /> .Contingency.to be Used for Overruns, Additions 49 753 00 <br /> , • <br /> to System, Paving Rural Fire Department Drives, <br /> and Property Owner Participation <br /> ; Note: If right of way is not available on the <br /> above unpaved roads, the funds will be <br /> 4 programmed on other roads in the order <br /> of priority or applied on property owner <br /> Participation paving. <br />
The URL can be used to link to this page
Your browser does not support the video tag.