Orange County NC Website
082 <br /> PD-3-85 WEST TEN MOBILE PARK 4 <br /> 11. Mailboxes which are clustered shall be provided close to each <br /> entrance, but far enough into the development to prevent <br /> traffic problems on West Ten Road. A pull-off shall be <br /> provided and the mailboxes set back off the main entrance <br /> roads. The entrance roads and pull-offs shall be of <br /> sufficient width to allow three or four cars to stop and get <br /> mail while others continue to pass. The mailboxes shall not be <br /> located in a place that would require cars to cross traffic, <br /> make unnatural turns or go against the flow of traffic. <br /> Cluster mailboxes shall be located outside of sight triangles <br /> for entranceways. <br /> 12. Prior to the initiation of construction activity, final <br /> approval by the Orange County Health Department of the well and <br /> septic systems must be obtained. <br /> 13. The recreation areas shall be constructed as provided in the <br /> application and submitted site plan. <br /> The pedestrian paths and nature trail serving the individual <br /> units and the recreation areas shall be a minimum of 72" wide <br /> and be composed of surface materials recommended by the Orange <br /> County Recreation Department. A pedestrian crossing shall be <br /> provided to the nature trail at the north-east corner of the <br /> residential cluster. <br /> 14. That all signs be erected in compliance with Article 9 Signs <br /> following issuance of a building permit and prior to the <br /> issuance of a Certificate of Occupancy for any unit. No sign <br /> may be erected within the sight triangles for the entranceways <br /> to the development. <br /> 15. Grading on the site shall be kept to a minimum. In lieu of <br /> planted landscaping, existing vegetation shall be maintained <br /> between units. <br /> 16. All plans for drainage, soil erosion and sedimentation control <br /> shall be reviewed and approved by Orange County. In addition, <br /> Orange County shall inspect the installation of control devices <br /> and the on-going work for the total project. The project shall <br /> at all times meet the requirements of the Orange County Soil <br /> Erosion and Sedimentation Control Ordinance. <br /> 17. The project must remain in unitary ownership and no lots can be <br /> sold to individuals. <br /> 18. A unit numbering system and corresponding unit location shall <br /> be filed with the Planning Department prior to the issuance of <br /> any building permit. This system shall be used in obtaining <br /> and issuing any building permit. Any change in the unit <br /> • <br />