Orange County NC Website
. . . <br /> 0 8 2 <br /> 11.6 Allow ground absorption sewage disposal systems of 3000 gallons <br /> per day or more design capacity and package sewage treatment <br /> plants with a design capactiy of 3000 gallona per day or less as <br /> appropriate only in the areas designated Ten and Twenty Year <br /> Transition and Rural Residential. <br /> 11.7 Develop and implement a process whereby the responsibilities and <br /> duties adjunct to the operation and management of package sewage <br /> treatment olants are specified as a reouirment to the permittinm <br /> process for such facilities. <br /> AMENDED 11.8 Prohibit nackagre sewage treatment plants in the areas designated <br /> 4/2/84 Water Supply Watershed. <br /> 11.9 Establish an on-site wastewater treatment inspection program <br /> within the portions of water supply watersheds designated as <br /> Water Quality Critical Areas. <br /> • <br /> GOAL TWELVE: An efficient and balanced transportation system. <br /> 12.1 Improve and promote the use of exiating highway and transportation <br /> facilities as opposed to developing extensive new conventional <br /> • transportation syatems. <br /> 12.2 Encourage arrangements of land uses that facilitate the expanded <br /> use of non-auto modes of travel; the increased occupancy of Autos <br /> and the development and utilization of an energy-efficient trans- <br /> port system.. <br /> • <br /> 12.3 Develop alternative, safe, energy-efficient transportation sys <br /> tems to discourage dependence on automobiles. Encourage the pro- <br /> visions of bikeways, walkways and supportive facilities such as <br /> bicycle parking zones. Wherever feasible, acquire pedestrian and <br /> bikeway easements with public utility easements as long as the <br /> primary use of the easement will remain intact. <br /> 12.a Improve transportation services for human service agency clients • <br /> in the County through coordination and utilization of available <br /> ' resources, while maintaining or reducing present system costs. <br /> Encourage the use of private transportation providers as part of <br /> the human services system in addition to serving the needs of the <br /> general public. <br /> 1 <br /> 12.5 Encourage DOT to reassess the need for I-40 and the corridor selec- <br /> ted with respect to its human and natural environmental impact on <br /> the County. <br /> 12.6 Undertake a feasibility study to (1)-determine the level of need <br /> for a general aviation facility to serve the County and (2) examine <br /> locational alternatives for a facility given a determination of <br /> sufficient need. <br /> 12.7 Develop a Highway Classification System to classify major roads <br /> by function for purposes of effective long range planning including <br /> the evaluation of highway capacity. The functional classification <br /> includes: Interstate, arterial, collector,. subcollector, minor, <br /> local, nrivate and alley. <br />