Orange County NC Website
MAJOR SUBDIVISION CHECKLIST <br /> Ernie McBroom <br /> NAME OF SUBDIVISION Forrester Bend - Section Two OWNER 4R DEVELOPER -- f <br /> ADDRESS <br /> Route 4, Box 458, Hillsborough, NC 27278 <br /> � <br /> little River <br /> BLOCK - LOT p/o 18G <br /> TOWNSHIP TAX MAP 25 _ <br /> NAME OF SURVEYOR OR ENGINEER -ENT land Surve s <br /> Total number of lots 4 To be developed in __L__phase.(s). Total number of acres 3.71 <br /> Typical dwelling units at present nana or proposed <br /> WATER SUPPLY: Public (Dame) <br /> Community Individual! X <br /> SEWAGE TREATMENT: Public Community Individual Septic tank X __ <br /> SCHOOL DISTRICT Orange [�� tv FIRE DISTRICT ran a Rural <br /> Access onto State Road # NC Road Standard: Public or Private Class A_ r B C__7_ <br /> Existing critical areas such as streams { ), <br /> Flood prone areas ( ), Watershed { }, Historic Sites ( ) , Other .{ ) <br /> Explain: <br /> Land uses in the general area <br /> Aqr-i e44 <br /> SKETCH PLAN RECEIVED- {Date) 2-27-85 Approved { ) Recommended Changes { X ) <br /> REVISED PRELIMINARY PLAN RECEIVED (Date) <br /> PRELIMINARY PLAN RECEIVED (Date) 5"3'$5 Erosion Control Officer 5"17- 5 MKR <br /> Preliminary Review by Health Department Ron Floldwav 5-16-$5 _ Department of Transportation <br /> Board of Education Ira Troll�nger 513-85 <br /> OWASA iif possible) - <br /> -Mebane (if possible) <br /> Other -Hillsborough- (if possible) <br /> Orange/Alamance (if possible) <br /> Preliminary Action by the Planning Board . 0 - " <br /> Preliminary Action by the County Conanissioners <br /> FINAL PLAT RECEIVED (Date) <br /> ( } All lots were approved by the Health Department <br /> ( } Lots failing Health Departments approval are combined or listed properly on the plat <br /> ( ) Road Maintenance Agreement submitted (where applicable) . Approved <br /> { } <br /> ided for; completed; 3b '&lspecificat ions, Date <br /> Dat <br /> Improvements. have been prov e <br /> ( } Final OWASA approval (where applicable) on'all p ans <br /> ( ) Final DOT approval on plat <br /> ( ) Final action by the Planning Board_ <br />