Browse
Search
2016-518-E AMS - Durham Electric Company, Inc. for power for Seymour Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-518-E AMS - Durham Electric Company, Inc. for power for Seymour Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2016 3:01:14 PM
Creation date
9/9/2016 3:00:49 PM
Metadata
Fields
Template:
BOCC
Date
9/9/2016
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Amount
$6,222.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:7B2CBCO2-5439-4FB9-8D4B-EC0A1D0A2292 <br /> Durham Electric Company, Inc. <br /> 807 North Mangum Streeto®®Durham,NC 27701 <br /> Office 919-682-5771...Fax 919-682-5772 <br /> E5t — Durham <br /> 195g Electt c Company <br /> PROPOSAL <br /> Date:July 28,2016 <br /> Attn:Angel Barnes <br /> Capital Projects Manager <br /> Orange County Asset Management Services <br /> 131 West Margaret Lane <br /> Hillsborough,N.C.27278 <br /> Direct 919-245-2628 Mobile 919-610-8182 <br /> a barnes@orangecountync.gov <br /> Thank you very much for allowing Durham Electric Company to offer this proposal for the Electrical Work <br /> at <br /> The Southern Orange Senior Center/Robert and Pearl Seymour Center <br /> 2551 Homestead Road,Chapel Hill, N.C. 27516 NC. <br /> This proposal includes the work as described in the"Scope of Work"section below. <br /> SCOPE of Work: <br /> Durham Electric Company's proposal includes furnishing all materials, labor, inspections and equipment <br /> required to install the following electrical system. <br /> 1) Install(4) Hubbell SIR4PTQUADBRS flush floor boxes with brass cover and trim in the locations <br /> pointed out during the site walk-thru. Each box has(4)120V receptacles.(1) 120V 20-amp circuit <br /> will feed(2)floor boxes.A(4") hole will need to be drilled through the floor for each floor box.The <br /> core drilling is included in our quote.A conduit will be installed downstairs with the required <br /> wiring to feed the floor boxes.The feeder conduits and wiring will originate from an existing panel <br /> downstairs. <br /> 2) Install(1) 120V 20-amp outlet in the wall for a copier.This will be a dedicated circuit originating <br /> from the existing panel downstairs. <br /> 3) Install(1)120V 20-amp outlet in column near the floor boxes.This will be a dedicated circuit <br /> originating from the existing panel downstairs <br /> All materials,devices,floor boxes,wiring,conduits and other miscellaneous items are UL listed, heavy duty <br /> commercial grade.The installation and workmanship will meet or exceed NEC requirements. <br /> All work described above to be done on Sundays. <br /> Total Quote for the work as described above is:$6,222.00 <br /> Please contact me with any questions. <br /> Thank you for the opportunity, <br /> Bill Parks <br /> Vice President of Operations <br /> Durham Electric Company Inc. <br /> 807 N. Mangum St. <br /> Durham, NC 27701 <br /> Office 919-682-5771 Fax 919-682-5772 Mobile 919-698-6946 <br /> bill,parks @durhamelectriccompany.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.