Browse
Search
Agenda - 05-21-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 05-21-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2016 10:38:50 AM
Creation date
9/9/2016 10:00:41 AM
Metadata
Fields
Template:
BOCC
Date
5/21/1985
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S WYER, Pc. M <br /> ENGINEERS <br /> - 4 <br /> RALEIGH,NORTH CAROLINA x7622 1949)782.8333 <br /> MAILING ADDRESS:P.O.BOX 30428 45O5CREEDMOOR ROAD CRAMEE VALLEY <br /> OFFICE LOCATION:302 COTTON BUILDING <br /> May 20; 1985 <br /> Mr. Kenneth R. Thompson <br /> County Manager <br /> County of Orange <br /> 106 East Margaret Lane <br /> Hillsborough, North Carolina 27278 <br /> I . <br /> Dear Mr. Thompson: <br /> Based on the discussions at the joint meeting of the Orange <br /> County Commissioners and the Town Board of Hillsborough on <br /> May 16, 1985, Hazen and Sawyer has made additional investigations <br /> of several matters concerning the proposed point of intercon- <br /> nection between the Cheeks Township Sewer facilities and the <br /> existing collection system of the Town of Hillsborough. The <br /> following information and comments are offered for consideration <br /> by the County and the Town of Hillsborough relative to these <br /> issues: <br /> 1. The Town of Hillsborough is considering the feasibility <br /> of assuming responsibility for construction of <br /> approximately -1,900 feet of gravity sewer in Orange <br /> Heights to serve as the link between the Town' s existing <br /> collection system and the force main to be constructed <br /> by the County. Assuming the Town constructed this <br /> portion of the required sewer facilities, the County <br /> would realize a reduction in construction cost of <br /> approximately $70,000. While this influence is indeed <br /> possitive, it is moderated by the loss of potential <br /> County sewer customers in Orange Heights, in order to <br /> assess the net effect of this proposal, additional <br /> analyses have been made of projected user. charges for <br /> the remaining County sewer customer.s assuming no County <br /> i <br /> I <br /> I <br /> i - <br /> - <br /> i - <br /> OFFICES IN NEW YORK,RALEIGH,AND HOLLYWOOD.FLORIDA <br />
The URL can be used to link to this page
Your browser does not support the video tag.