Browse
Search
Agenda - 05-16-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 05-16-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2016 9:54:17 AM
Creation date
9/9/2016 9:53:21 AM
Metadata
Fields
Template:
BOCC
Date
5/16/1985
Meeting Type
Municipalities
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> HAZEN AND SAWYER, P C. H <br /> • ENGINEERS <br /> MAILING ADDRESS:P.O.BOX 30428 RALEIGH,NORTH CAROLINA 27622 (019)7828333 <br /> OFFICE LOCATION:302 COTTON BUILDING 4505 CREEDMOOR ROAD CRABTREE VALLEY -- • <br /> May 14, 1985 <br /> • <br /> Mr. Kenneth R. Thompson • <br /> • <br /> County Manager <br /> County of Orange <br /> 106 East Margaret Lane <br /> Hillsborough, North Carolina 27278 <br /> Dear Mr. Thompson: <br /> At a meeting on May.13, 1985, the County Commissioners <br /> discussed the possibility of the Town of Hillsborough assuming <br /> financial responsibility for construction of a portion of the <br /> proposed force main from Cheeks Township. As we understand the <br /> proposal being evaluated, the Town of Hillsborough would be <br /> responsible for construction and maintenance of the force main <br /> and gravity sewer facilities located east of the Eno River. A <br /> secondary option under consideration would shift the point of <br /> •- acceptance of the wastewater by the Town of Hillsborough to the <br /> intersection of US 70 and West Hill Avenue, The estimated <br /> construction cost for each of the above options is as follows: ' <br /> 1. If point of acceptance is immediately east of the Eno <br /> • River <br /> Estimated Unit <br /> Item Quantity Price Total <br /> 12-in gravity sewer 1900 if 23.00 $ 43,700 <br /> 8-in force main 5200 if 8.00 41,600 <br /> 4 ft dia manhole 9 ea 950 8,600 <br /> Rock Excavation 360 cy 35.00 12,600 <br /> Surface Restoration 3.5 ac 1500 5,300 <br /> House Service 20 ea 300 6,000 <br /> • <br /> Subtotal 117,800 <br /> Contingencies (10%) 11,800 <br /> Total Construction Cost $129,600 <br /> Say $130,000 <br /> • <br /> (OVER) <br /> OFFICES IN NEW YORK,RALEIGH,AND HOLLYWOOD,FLORIDA <br /> • <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.