Orange County NC Website
or corporations located in Phase I of the Project <br /> we: <br /> Area apply for connection to and sewer service for <br /> existing dwellings and businesses during the <br /> initial application period. <br /> 9. The operating expense portion of the System budget <br /> shall be prepared on the basis of 233 initial <br /> connections. <br /> 10. User rates shall be as established on the attached <br /> rate schedule and may be revised from time to time <br /> as determined by the Board. <br /> 11. Orange County will appropriate annually to the <br /> operating revenues of the System operating budget <br /> the difference between annual expenditures and <br /> - •- revenues received from user fees, investment and <br /> other income of the System. <br /> AND WHEREAS the System Engineer has identified 14 parcels of land <br /> improved with dwellings or businesses which are not <br /> located within Phase I of the Project Area but which ., <br /> are located adjacent to it and on Southern Avenue; and <br /> • <br /> WHEREAS it may be feasible to connect these parcels to the - <br /> System within the System budget. <br /> IT IS THEREFORE FURTHER RESOLVED THAT: <br /> Provided the bid for the System, including construction <br /> of the portion of the System necessary to serve these 14 <br /> parcels, which is accepted by Orange County is within <br /> • -5- <br />