Browse
Search
Agenda - 03-13-2007-5o
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 03-13-2007
>
Agenda - 03-13-2007-5o
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 6:43:50 PM
Creation date
8/28/2008 11:23:29 AM
Metadata
Fields
Template:
BOCC
Date
3/13/2007
Document Type
Agenda
Agenda Item
5o
Document Relationships
Minutes - 20070313
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
S Purchasing - Corley Redfoot Zack Central Orange Sr Center
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: March 13, 2007 <br />Action Agenda <br />Item No. ~~_ <br />SUBJECT: Approval of Contract Amendment: Design Services Central Orange Senior <br />Center <br />DEPARTMENT: Purchasing PUBLIC HEARING: (Y/N) No <br />ATTACHMENT(S): <br />CRZ Proposal <br />Pam Jones, (919) 245-2652 <br />INFORMATION CONTACT: <br />PURPOSE: To consider approving an amendment to the contract for design services associated <br />with the Central Orange Senior Center. <br />BACKGROUND: The Board originally approved a contract with Corley Redfoot Zack (CRZ) to <br />provide schematic design for work at the Sportsplex that would become the Central Orange <br />Senior Center. The fee proposal for this work provided Basic Services fora 15,000 square foot <br />senior center, which consisted of a 10,000 square foot addition and 5,000 square feet of <br />renovated space. The project was expanded to include an Adult Day Health Center, which <br />reduced the Sportsplex area by another 4,100 square feet. <br />Sportsplex operations have flourished under the management of Recreational Factory Partners <br />(RFP), who the County retained when it purchased the property in December 2005. In order to <br />maintain sufficient operational space for the Sportsplex, County Commissioners authorized the <br />addition of a mezzanine area over the ice rink and other more minor renovations within the <br />common areas of the Sportsplex. This replaces the space assumed by the Senior Center and <br />added some minimal growth space for Sportsplex operations. <br />All components of the project now equal approximately 35,000 square feet. <br />CRZ proposes a total of $407,200 for Basic Services architectural and engineering fees through <br />construction administration. This equates to approximately 8.3% of the estimated $4.9 million <br />budget set aside for construction of the project. Additional services, which include regulatory <br />approval and interior design services, are estimated at $21,540. The original contract amount for <br />schematic design ($28,940) is offered as a credit, thereby setting the total contract approved by <br />this action at $400,160. <br />
The URL can be used to link to this page
Your browser does not support the video tag.