Orange County NC Website
' - <br /> Alternate A - would consist of the upstream portion of the <br /> proposed McGowan Creek interceptor. The pumping station <br /> included in the base bid would be relocated to the <br /> downstream end of the proposed interceptor. A six-inch <br /> force main would connect to the force main constructed under <br /> the base bid along uS 70. This alternative readily lends <br /> itself to extension of gravity sewers into the central <br /> Efland area at a later date. <br /> Alternate B - includes the remainder of the proposed McGowan <br /> Creek interceptor and the Brookhollow Road pump station <br /> which discharges into the force main along US 70 constructed <br /> under the base bid. This alternative will readily lend <br /> itself to extension of sewer service to serve Graham's <br /> Trailer Park and the surrounding area <br /> Alternate C - consists of the gravity collection system in <br /> the central Efland area. <br /> 13 <br />