Browse
Search
Agenda - 05-06-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 05-06-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 2:08:20 PM
Creation date
9/8/2016 4:33:18 PM
Metadata
Fields
Template:
BOCC
Date
5/6/1985
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, I <br /> We believe that implementation of the above improvements <br /> will significantly improve the reliability of the proposed sewer <br /> improvements by reducing the dependence on raw sewage pumping. <br /> The revised plan can be readily expanded to serve future <br /> development in the transition areas and the industrial <br /> development along the 1-85 corridor. <br /> Estimated Construction Cost <br /> One of the primary objectives of the additional study by <br /> Hazen and Sawyer was to evaluate the construction cost estimate <br /> for the proposed Phase I sewer improvements. Our initial <br /> assessment indicated that the prevailing construction costs in <br /> the Orange County area were significantly higher than the unit <br /> prices used in the previous report. In order to confirm this <br /> possibility, we collected cost data from the Farmers Home <br /> Administration for a number of similar projects constructed over <br /> the last several months. The cost data was analyzed to determine <br /> typical or average construction prices for each element of the <br /> proposed sewer construction. These costs were then used to <br /> develop updated construction cost estimates for both the original <br /> Phase I sewer improvements plan and the Phase I improvements as <br /> modified by Hazen and Sawyer. The tabulated construction costs <br /> are included herein in Table 1. <br /> As suspected, the analysis indicates that the construction <br /> costs for both the original plan and the modified plan <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.