Browse
Search
Agenda - 05-06-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 05-06-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 2:08:20 PM
Creation date
9/8/2016 4:33:18 PM
Metadata
Fields
Template:
BOCC
Date
5/6/1985
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
it is possible to eliminate approximately 2 ,500 linear <br /> feet of 4-inch force main at a cost savings of at least <br /> $10,000. <br /> 4. The existing topography along the unnamed street east of, <br /> Gaines Avenue will not .ermit a •ravit sewer flowin. in <br /> a westerly direction since the east end of the street is <br /> approximately 15 feet lower than the west end. In order <br /> to provide sewer service to the existing residences <br /> along this street, it is recommended that a gravity <br /> sewer be extended along the existing draw to the north <br /> crossing US 70 and connecting to the proposed <br /> interceptor on McGowan Creek. Likewise, the existing <br /> gravity sewer off Tinnin Road tributary to the <br /> originally proposed Pump Station No. 2 does not appear <br /> to be feasible due to topographic restraints. In order <br /> to construct a gravity sewer in this area, it will be <br /> necessary to pivot the line further to the east in the <br /> direction of more favorable topographic features. <br /> 5. Other less significant modifications to the proposed <br /> Phase I sewer improvement are indicated below: <br /> a. In The Efland Estates Subdivision, it is <br /> recommended that the gravity sewer shown on <br /> private property behind the existing houses on <br /> Gregg Street be relocated to the right-of-way on <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.