Orange County NC Website
1. Construction of a 12-inch diameter interceptor in the <br /> McGowan Creek basin from Tinnin Road (SR 1313) to <br /> Brookhollow Road (SR 1338) in lieu of the force main and <br /> pumping station included in the McAdams report. This <br /> outfall would have the immediate benefit of eliminating <br /> a pump station at Tinnin Road and the approximately 7500 <br /> • feet of 6-inch force main through. the central part of <br /> Efland along US 70. We further believe that the gravity <br /> outfall can be constructed at a comparable cost, to the <br /> present pump station force main concept. Future <br /> benefits are potentially much more significant and <br /> include: <br /> a. The outfall will provide an initial key component <br /> for extensions of sewer service into the <br /> transition area north of Efland. <br /> b. The presence of the gravity outfall will permit <br /> extension of gravity sewers into the central part <br /> of Efland thus eliminating an additional pump <br /> station that would have been required in Phase II <br /> of the original sewer plan. <br /> c. Service to those areas included in Phases III <br /> and IV in the original plan and the industrial <br /> corridor along 1-85 would be readily available <br /> provided that the wastewater is pumped across the <br /> 4 <br />