Browse
Search
Agenda - 05-06-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 05-06-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 2:08:20 PM
Creation date
9/8/2016 4:33:18 PM
Metadata
Fields
Template:
BOCC
Date
5/6/1985
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . <br /> Project Description <br /> The study area for the proposed project as described in the <br /> McAdams' report generally consists of the area bounded by the <br /> Town of Hillsborough on the east, by Buckhorn Road (SR 1114) on <br /> the west, by Seven Mile Creek on the south, and by McGowan Creek <br /> on the north. For planning purposes, the study area is further <br /> divided into two sub-areas; the immediate planning area which <br /> consists of that area generally lying along US 70 in the center <br /> of the total study area where development already exists and the <br /> future planning area which consists of the area in the McGowan <br /> Creek basin to the north of the immediate planning area and the <br /> area to the south of the immediate planning area along the 1-85 <br /> corridor. The proposed sewer improvements for the immediate <br /> planning area consists of various elements to be constructed in <br /> six phases. Phase I of the recommended plan was intended to <br /> • provide the primary interceptor system, pumping stations and <br /> force mains to collect the wastewater from the Efland Estates <br /> Subdivision, the Efland Cheeks School , the central Efland area, <br /> and Graham' s Trailer Park near Maple Street. Wastewater thus <br /> collected would be pumped from a main pumping station off <br /> Brookhollow Road via a force main along US 70 East to the point <br /> of tie-in with the Town of Hillsborough collection system. <br /> Phases II through VI of the recommended sewer improvements would <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.