Browse
Search
Agenda - 05-06-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 05-06-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 2:08:20 PM
Creation date
9/8/2016 4:33:18 PM
Metadata
Fields
Template:
BOCC
Date
5/6/1985
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED <br /> PRELIMINARY ENGINEERING REPORT <br /> CHEEKS TOWNSHIP SEWER IMPROVEMENTS <br /> PHASE I <br /> Background <br /> The proposed sewer improvements for Cheeks Township are <br /> described in a report prepared by the John R. McAdams Company, <br /> Inc. of Chapel Hill, N. C. dated February 1984. Hazen and <br /> Sawyer, P.C. of Raleigh, North Carolina was retained by Orange <br /> County in March of 1985 for the purpose of designing and <br /> administering construction of those facilities included in Phase <br /> 1 of the improvements recommended in the McAdams' report. Per <br /> the terms of the engineering agreement between the County and <br /> Hazen and Sawyer, the initial Hazen and Sawyer effort was to be <br /> directed to a general review, of the overall sewer system plan, <br /> technical evaluation of certain elements of the proposed plan and <br /> a review of the project cost estimate and financing plan. The <br /> purpose of The Revised Preliminary Engineering Report is to <br /> summarize the conclusion and recommendations relative to Phase 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.