Browse
Search
Agenda - 05-06-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 05-06-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 2:08:20 PM
Creation date
9/8/2016 4:33:18 PM
Metadata
Fields
Template:
BOCC
Date
5/6/1985
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05• <br /> • <br /> ''t� <br /> Ifiune v i ii:471-407 <br /> Durham Construction Company. Inc. <br /> 112 Brilama Avenue <br /> i Pusi Office Box 15028 <br /> N.C.Lic.#6533 Durham, North Carolina 27704-0028 <br /> April 30, 1985 <br /> Mr. Roman Kolodij , Architect • <br /> 701 East Rosemary Street <br /> Chapel Hill , North Carolina 27514 <br /> Re: Orange County Courthouse <br /> Hillsborough, North Carolina <br /> Dear Mr. Kolodij: <br /> The rooms on the main floor that_were shown to have 12" of _masonry <br /> facing are actually 12" of solid concrete and 5" of concrete ceiling. (400 s.f.) <br /> To remove this concrete is going to be very time consuming and costly. <br /> I am providing you with a •breakdown of costs below. <br /> COST BREAKDOWN: <br /> 1) Labor to remove 900 s.f. of wall concrete $ 2,900,00 <br /> 2) Air compressor and accessories ..0,0.....0...00.,..0.0.00 800.00 <br /> 3) Labor to remove 400 s.f. of ceiling concrete 1,200.00 <br /> . 4) Shoring and securing ceiling concrete 250.00 <br /> 5) Removing flooring on second floor (400 s.f.) 300.00 <br /> 6) Reinstalling second floor wood flooring 500.00 <br /> 7) Credit for removing specified masonry wall (800.00) F-- <br /> • SUBTOTAL .............e..0000.e...0...................Mo5,150.00 <br /> 8) Durham Const. Co., Inc., overhead (10%) 515.00 <br /> 9) Durham Const. Co., Inc. , profit (10%) OOOOO 000.0 OOOOOO of 566.50 <br /> TOTAL ADDITIONS ..0000........0........0.00000.....0.......0 $ 6,231.50 <br /> ** Additional twenty (20) days needed. <br /> As you are aware from our meeting on April 22, 1985, this portion <br /> of the demolition work needs to be started now. Please issue us a <br /> change order to do this work if there are no other problems that might ' <br /> hinder us. <br /> • <br /> If I can be of further assistance, do not hesitate to contact me. <br /> Sincerely yours, <br /> ir.;g >"1— <br /> Kenneth A. Hunt <br /> President <br /> KAH/l rs • <br />
The URL can be used to link to this page
Your browser does not support the video tag.