Browse
Search
Agenda - 04-16-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 04-16-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 1:54:15 PM
Creation date
9/8/2016 4:13:53 PM
Metadata
Fields
Template:
BOCC
Date
4/16/1985
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 ti 6 <br /> . , <br /> 1.., CHAPEL HILL-CARRBORO CITY SCHOOLS <br /> , <br /> \Hie/ UNCOLN CENTER,WORT WU,ROAD <br /> CHAPEL HILL N.C.27514 <br /> RICHARD DRAKE,Director of Maintenance <br /> Telephone(919)967-82" <br /> and Vocational Education <br /> PAMELA S.MAYER,Superintendent <br /> - . <br /> MEMORAML14 <br /> TO: Gerry House <br /> Assistant Superintendent for Support Services <br /> FR114: Richard Drake 1.-14\ <br /> RE: Design Work Proposals for Long-Range Capital Needs <br /> DATE: March 21, 1985 <br /> I• <br /> I have attached copies of the design work proposals which I requested <br /> Ferebee Walters and Associates to submit per the interest expressed at a recent <br /> staff meeting. Please keep several things in mind. <br /> 1. These proposals have been developed an short notice with only mininim <br /> discussion between us and Ferebee Walters and Associates. Therefore the scope <br /> of the projects reflected in the proposal may not be accurate. In most cases <br /> I would expect that the scope may be broader than is necessary, therefore, the <br /> costs are probably at littlXit/L1M levels. <br /> 2. The totals are based on full architectural services to complete a <br /> project from schematics through construction aOministration. <br /> 3. For planning purposes the first two steps, schematic design and design <br /> development, is probably all that would be necessary. <br /> 4. In some of our previous planning some of this work has been addressed, <br /> (i.e.), schematic design for media and cafeteria renovations, some planning <br /> work for air conditioning Phillips and Frank Porter Graham, and depending on <br /> how closely we reproduce the multipurpose building at Frank Porter Graham, <br /> some design work for multipurpose buildings may have been accomplished. <br /> Should we wish to pursue initial design work for these projects we <br /> should ask the commissioners for the following: <br /> - u.1...climv1Bui.....1di_m_s <br /> Schematic Design Work $ 4,650.00 <br /> Design Development 6,200.00 <br /> - P.121121aLEEME..-Calcioq---151— na <br /> Schematic Design Work and <br /> Design Development <br /> (@ 30% of $75,000) $22,500.00 <br /> • <br /> ';',.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.