Orange County NC Website
0 ti 6 <br /> . , <br /> 1.., CHAPEL HILL-CARRBORO CITY SCHOOLS <br /> , <br /> \Hie/ UNCOLN CENTER,WORT WU,ROAD <br /> CHAPEL HILL N.C.27514 <br /> RICHARD DRAKE,Director of Maintenance <br /> Telephone(919)967-82" <br /> and Vocational Education <br /> PAMELA S.MAYER,Superintendent <br /> - . <br /> MEMORAML14 <br /> TO: Gerry House <br /> Assistant Superintendent for Support Services <br /> FR114: Richard Drake 1.-14\ <br /> RE: Design Work Proposals for Long-Range Capital Needs <br /> DATE: March 21, 1985 <br /> I• <br /> I have attached copies of the design work proposals which I requested <br /> Ferebee Walters and Associates to submit per the interest expressed at a recent <br /> staff meeting. Please keep several things in mind. <br /> 1. These proposals have been developed an short notice with only mininim <br /> discussion between us and Ferebee Walters and Associates. Therefore the scope <br /> of the projects reflected in the proposal may not be accurate. In most cases <br /> I would expect that the scope may be broader than is necessary, therefore, the <br /> costs are probably at littlXit/L1M levels. <br /> 2. The totals are based on full architectural services to complete a <br /> project from schematics through construction aOministration. <br /> 3. For planning purposes the first two steps, schematic design and design <br /> development, is probably all that would be necessary. <br /> 4. In some of our previous planning some of this work has been addressed, <br /> (i.e.), schematic design for media and cafeteria renovations, some planning <br /> work for air conditioning Phillips and Frank Porter Graham, and depending on <br /> how closely we reproduce the multipurpose building at Frank Porter Graham, <br /> some design work for multipurpose buildings may have been accomplished. <br /> Should we wish to pursue initial design work for these projects we <br /> should ask the commissioners for the following: <br /> - u.1...climv1Bui.....1di_m_s <br /> Schematic Design Work $ 4,650.00 <br /> Design Development 6,200.00 <br /> - P.121121aLEEME..-Calcioq---151— na <br /> Schematic Design Work and <br /> Design Development <br /> (@ 30% of $75,000) $22,500.00 <br /> • <br /> ';',.. <br />