Browse
Search
Agenda - 04-01-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 04-01-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 1:48:24 PM
Creation date
9/8/2016 3:58:09 PM
Metadata
Fields
Template:
BOCC
Date
4/1/1985
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. The County shall install, a peter at the point where the County's <br /> system is connected to the Hillsborough Suer System for the purpose of <br /> measuring the flow of wastewater from the County's system into the T wn's <br /> system. <br /> 7. The County agrees to pay the Town each month the sum of $1.11 per <br /> thousand gallons of wastewater passing through said meter. <br /> 8. The Town reserves the right to adjust the rate per 1,000 gallons <br /> charged to the County whenever the Town adjusts its rates charged to its other <br /> customers. <br /> 9. The wastewater collection .system constructed by the County shall be <br /> the property of the County. The Tbwn shall not allow any connection to the <br /> Town's system which shall have the effect of circumventing or competing with <br /> this agreement. It shall be the responsibility of the County to maintain its <br /> wastewater collection and transport system and perform all customer billing and <br /> collections. This does not preclude the County from contracting maintenance <br /> and/or billing functions. <br /> 10. Any failure of the Town's wastewater collection system or wastewater <br /> treatment facility which impedes the flow of wastewater from the County's <br /> wastewater collection system shall be remedied by the Ton with all possible <br /> dispatch. in the event of an extended period of malfunction of the ¶LtMn's <br /> wastewater collection <br /> system, the County's customers shad], be required to <br /> reduce their discharge only in the same ratio or proporation as that required <br /> of the Town's other customers. <br /> 11. The construction of the wastewater collection and treatment system <br /> by the County is being financed by a loan made, or insured by, and grant from <br /> the United States Department of Agriculture. No provision set forth in this <br /> Contract shall be binding upon either party unless and until all terms and <br /> provisions hereof have been approved in writing by the N.C. State Director of <br /> the Farmers Hoare Administration U.S.D.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.