Browse
Search
Agenda - 04-01-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 04-01-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 1:48:24 PM
Creation date
9/8/2016 3:58:09 PM
Metadata
Fields
Template:
BOCC
Date
4/1/1985
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
021 <br /> and Town Superintendent of Utilities in order to insure its compatibility with <br /> the Town's wastewater collection and treatment facilities and policies. <br /> 2. The County agrees to pay the Town $15,000.00 as a blanket connection IP <br /> (tap) fee for the privilege of connecting the Efland-Cheeks Elementary School <br /> wastewater facility and the County's initial 212 customers to the Town's <br /> system. The customer list and map will be provided to the Town not later than <br /> the 1st day of July, 1985. Five thousand dollars of the $15,000 is for the <br /> cost of tap-on of the Efland Cheeks Elementary School. The above $15,000 <br /> connection fee shall be paid before any wastewater is permitted to flow through <br /> the meter. <br /> 3. The Town agrees to treat, at the rates herein prescribed, up to <br /> 55,000 gallons of the County system's wastewater per day, which is the <br /> equivalent of the wastewater generated by said school and the initial 212 <br /> customers of the County's wastewater collection system, and to treat up to an <br /> additional 325,000 gallons per day for additional customers in the future. <br /> 4. No customer-shall be allowed to connect to the County system unless <br /> and until such customer's proposed discharge has been found acceptable by both <br /> the Town Water Superintendent and County. Approval shall be predicated on (1) <br /> the quality of the effluent of the potential user being compatible with the <br /> Tiawn's NPDES discharge permit, (2) compliance with the Ton's ordinance, rules, <br /> and regulations concerning pretreatment of industrial wastewater, and (3) all <br /> County (subdivision, zoning, erosion, building, etc.) and State (DOT, etc.) <br /> permits having been properly granted. Under no circumstances will the County <br /> permit the discharge of septic sewage into its system. <br /> 5. After the first 212 customers above specified, each additional <br /> approved customer shall pay a $400 Town tap on fee. Customers other than those <br /> initially connected from among those initially applying for connection shall <br /> pay a $600 County tap-on fee. Both fees shall be collected by the County with <br /> the Town portion remitted to the Town as collected. <br />
The URL can be used to link to this page
Your browser does not support the video tag.