Orange County NC Website
_ - -- • , <br /> • <br /> - . . <br /> 099 <br /> . - . 0 , <br /> j) The applicant shall submit operational reports, prepared <br /> on an annual basis, detailing the amounts of materials --ii <br /> • extracted, extent of extractive area, depth of extractive, <br /> area, and results of groundwater test borings. <br /> k) Annual inspections of the operation - shall be conducted <br /> • by the Zoning Officer following submittal of the annual <br /> operations reports to determine compliance with the <br /> provisions of- the Special Use Permit. . <br /> 1) In cases of abandonment or termination of operations for) .... <br /> • a period of twelve (12) consecutive months, application <br /> - . for a new Special Use Permit is required. . <br /> - - _ • 110 - The Board of Commissioners shall require for all <br /> - - , .. • <br /> .extractive uses a. performance guarantee to insure that <br /> - - - the provisions of the Rehabilitation Plan are met. <br /> Such performance guarantee shall be in a form approved <br /> by the County Attorney. The amount of such guarantee <br /> shall cover the cost of rehabilitation on a per acre <br /> basis, if the cost does not exceed the amount posted <br /> • with the State- If the tehabilitation cost exceeds <br /> the amounts required -by the State then the difference•- shall be made up in a bond to Orange County. <br /> - <br /> - . - . . • <br /> . . <br /> . . . - <br /> ' . <br /> .. . .-.7, -- ' `• '- • . . . . <br /> , . <br /> . . . <br /> - - <br /> • . <br />