Orange County NC Website
.• _ ..._ . __ _______. ... .. -. .... . ..... . . .. . , • -_, .._ - <br /> • <br /> • - <br /> • . <br /> : • - <br /> -•. * . • <br /> . .. 095 <br /> . <br /> . • • . <br /> -t• <br /> . <br /> • ' - . 'I• <br /> . . <br /> • . <br /> V . PROPOSED AkENDMENTS <br /> . <br /> SECTION 8.8.1 - EXTRACTION OF EARTH PRODUCTS (CLASS A SPECIAL USE) <br /> . . ; . <br /> • V . . - <br /> Proposed amendments or additions are highlighted in italics. <br /> ' <br /> • V - 8.8.1 - Extraction of Earth-Ptoducts (Class A special Use) • <br /> - <br /> . . .. <br /> 8.8.11 Additioral Information - - v . - <br /> • <br /> • % . . <br /> - . <br /> _• - In addition to the information required by Subsection 8.2, the <br /> -. . ' <br /> following shall be submitted as part of the application. <br /> • . , <br /> - • - -.. •. • . <br /> '• .'*:. - - - --- .-'a) Seven copies of the site plan, prepared by a North Carolina • <br /> : i. , • . :. .. . -,,, . .. .- registered land surveyor or engineer, shall contain. the ; -* - - • <br /> -.' •• :. . , . '. : ' following: <br /> : • <br /> - , <br /> . • 1) EXtent of area to be excavated or mined . ' <br /> - <br /> _ . • _ . <br /> • . - - 2) Aerial photograph of site and all areas within 1,000 <br /> . . . <br /> V • . feet of the perimeter of the property flown within two <br /> •- • - ' v . •• . (2) months of the application for. a Special Use Permit. <br /> • . . . <br /> 3) Existing" topography at a contour interval of tWo. (2) <br /> . • • . . • - feet based on mean sea level datum. . .. . <br /> V . <br /> V V V V • V . - - 4) Land use, road system, natural features and topographical <br /> - . V (10 foot contour.intervals) details for the area within <br /> ' - <br /> V V V V 1,000 feet of the perimeter of the property. <br /> : . . <br /> , . .- . - 5) Typical cross-sections showing extent of overburden, <br /> ' ! <br /> extent of sand and gravel deposits, and water table. <br /> - 3 <br /> . <br /> . , . <br /> • 6) Proposed handling and storage areas for overburden, by- <br /> products and excavated materials. ' • • . . - <br /> .7) Location and results of groundwater'borings shooing depth . <br /> of groundwater. <br /> . . . <br /> 8) Any areas proposed for Ponding. <br /> ..• . ' - • I,- <br /> 9) Wind pattern details and on-site windbreaks. ' <br /> .,. - <br /> • 10) Soils details and statement addressing agricultural <br /> productivity and reclamation. <br /> . <br /> -' - v • <br /> - . . • <br /> • - . <br /> ' .. - ' ' • <br /> 12) Traffic impact analysis addressing the capacity of the .: C <br /> -_. <br /> I- <br /> -. .: . - , " . '.'1• - •.-- — ' •. . roads to serve the site. . .. , -• ,._ ,,.. . , . • <br /> 12).AcceisrOads to the site, as well as on-site roads, with . <br /> •‘• ;- ' --* :..r.: * • • --:- -- ..' .: ' '-' .• v-' indication of surface treatment to limit dust. Sight <br /> • ..- - <br /> . • distances on all roads used for access to the site <br /> . V VV V - ' 13) Required setback areas, including screening/buffering V • <br /> . •,- existing and/or proposed. If plant materials are to be <br /> ..- <br /> - • installed, the number, location, size and type of plants <br /> are to be identified. - • <br /> . . • <br /> - - . <br /> . - V b) An Operations Plan which shall include: <br /> • <br /> . 1) The date proposed to commence operations and their <br /> . V expected duration. . <br /> V <br /> . <br /> 14 <br /> •...a7 <br /> -- ... - - <br /> . <br /> • - <br /> 7. . <br /> • • . <br /> . - • <br /> - <br /> - <br /> . - • <br /> . . <br /> • . <br /> • . <br />