Orange County NC Website
• <br /> 02E <br /> ATTACHMENT TWO <br /> Septic System Development Service Cost <br /> 2-25-85 <br /> There are four defined services in septic system development. The Preliminary <br /> Lot Evaluation is suited for subdivision planning or locating building sites on <br /> more than 2 acre tracts of land. On platted building sites and sites of less <br /> than 2 acres, one would start the process with the Soil Analysis stage. The per <br /> day work allocation per sanitarian has been increased by 20 to 25% over 1978,' based <br /> upon experience and evaluation. The local standard is equal to that calculated <br /> by. the Division of Health Services Regional Sanitarian for the South Central DHS <br /> Region. The per service cost is: <br /> Average Cost Per Day Per Sanitarian $136.49 <br /> Preliminary Lot Evaluation <br /> Average travel time and evaluation of first acre at one hour 17.05 <br /> Average work time for remaining acres at 3 acres per hour on <br /> same trip; per acre after first acre 5.68. <br /> Soil Analysis Per Building Lot of 2 acres or less <br /> Average number of building lots analyzed and written <br /> records prepared per day per sanitarian equals 4; <br /> • therefore, the sanitarian man day cost is divided by 4 34.12 <br /> Inspection for Improvements Permit, <br /> Average number of field inspections and written record <br /> completion per day per sanitarian equals 5; therefore, <br /> the man day cost divided by 5 27.300 <br /> • <br /> Inspection for Certificate of Completion <br /> This cost is calculated identically to the Inspection <br /> for Improvements Permit preceeding 27.30 <br /> Summary Comments <br /> Every newly completed septic system requires three services, i.e., Soil Analysis, <br /> Inspection for Improvements Permit and Inspection for Certificate of Completion. <br /> Therefore, each completed septic system costs approximately <br /> Subdivisions require a Preliminary Lot Analysis to help the developer best utilize <br /> the land for septic disposal and avoid costly unusable acreage. The. per building lot <br /> cost is a function of how many acres the developer asks us to evaluate per trip. <br /> • <br />