Browse
Search
Agenda - 03-19-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 03-19-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2016 3:42:08 PM
Creation date
9/8/2016 3:27:29 PM
Metadata
Fields
Template:
BOCC
Date
3/19/1985
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> ARTICLE 1 <br /> THE CONTRACT DOCUMENTS <br /> The other Contract Documents wing , the this Specifications, all the Conditions <br /> ued prior to and all Modifications ter exe- <br /> other Conditions), the Drawings, the <br /> cution of this Agreement. These form the Contract, and all are as fully a part of h in e AContract as if attached to this <br /> Agreement or repeated herein. An enumeration of the Contract Documents appears <br /> ARTICLE 2 <br /> THE WORK <br /> The Contractor shall perform all the Work required by the Contract Documents for <br /> (Here insert the caption descriptive of the Work as used on other Contract Documents.) <br /> PLUMBING CONSTRUCTION <br /> for <br /> RENOVATIONS: <br /> Orange County Historic Courthouse <br /> Hillsborough, North Carolina <br /> Gr <br /> z�r <br /> ARTICLE 3 <br /> TIME OF COMMENCEMENT AND SUBSTANTIAL COMPLETION <br /> The Work to be performed under this Contract shall be commenced on the date speci fled in the <br /> Notice to Proceed issued by the Architect <br /> and, subject to authorized adjustments, Substantial Completion shall be achieved not later than <br /> (Here insert any special provisions for liquidated damages relating to failure to complete on rime.) <br /> One hundred eighty (180) consecutive calendar days from the Date specified <br /> in the Notice to Proceed, plus thirty (30) days extension for accepted <br /> Alternates as provided in Section 6, Supplementary General Conditions, <br /> for a total Contract Time not to exceed two hundred and ten (210) <br /> consecutive calendar days, subject to authorized adjustments as provided <br /> under Article 8, General Conditions. <br /> For each day in excess of the number of days specified above, the Contractor <br /> shall pay to the Owner the rate specified in Section 6, Supplementary <br /> General Conditions as liquidated damages, apportioned as determined by the <br /> Architect under provisions of Paragraph 6.3, Supplementary General Conditions. <br /> AIA DOCUMENT Al®1 • OWNER-CONTRACTOR AGREEMENT • ELEVENTH EDITION • JUNE 1977 • AIA0 <br /> 01977 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE. N.W., WASHINGTON, D.C. 20006 A101-1977 2 <br /> t.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.