Orange County NC Website
II. Construction description <br />a(0 <br />If your application is for construction of new trail <br />What is its total proposed length? 200ft of Land Trail <br />What is the width of your trail? 4 -6 ft <br />Of what material(s) is the trail tread constructed? Natural Surface <br />2. If your application is for trail maintenance /renovation, what is the total proposed <br />length? <br />What is the width of this trail? <br />Of what material(s) is the trail tread constructed? <br />3. Check the appropriate boxes to. show all expected trail user groups: <br />❑ hikers /walkers ❑ trail/mountain bicyclists <br />❑ horseback riders ❑ off -road vehicles (e.g., motorcycles, ATV's,OHV's) <br />X ADA accessible X canoeist/kayakers/boaters <br />4. Estimate the number of trail users per week that you project in each category checked: <br />50 trail users total <br />5. If your application is for construction of trail facilities (for example, parking, restrooms, <br />ramps, canoe platforms, boardwalks etc) what is the total area that will be impacted? <br />6. Please describe these facilities as completely as possible, including specific dimensions <br />(for example, parking area of 70 ft by 85 ft) when relevant: <br />7. Please describe any construction impact mitigation practices that you will be using: <br />Schedule C — Page 3 of 4 <br />