Browse
Search
Agenda - 03-06-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 03-06-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 12:16:50 PM
Creation date
9/8/2016 2:13:43 PM
Metadata
Fields
Template:
BOCC
Date
3/6/1985
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> • <br /> • 1 • <br /> A TOTAL OF 3,085 PERMITS WERE PROJECTED TO BE ISSUED WITH <br /> 6,340 INSPECTIONS .REQUIRED. FOR THE PERIOD <br /> JULY-DECEMBER, 1984, 1,617 PERMITS HAVE BEEN ISSUED AND <br /> 3,344 INSPECTIONS PERFORMED. THIS INDICATES THAT PERMITS <br /> AND INSPECTIONS ARE APPROXIMATELY 2% ABOVE PROJECTED <br /> 1984-85 LEVELS. TOTAL VALUATION OF ALL CONSTRUCTION IN <br /> THE PERIOD IS $12,059,254. • <br /> • <br /> 2. EROSION CONTROL <br /> FOR THE EROSION CONTROL DIVISION, 4,255' SITE INSPECTIONS • <br /> WERE PROJECTED IN 1984-85. IN ADDITION, 60 GRADING <br /> • PERMITS WERE ANTICIPATED AND 50 SITE PLAN.REVIEWS TO BE <br /> CONDUCTED. • . <br /> • <br /> FOR THE ' PERIOD JULY-NOVEMBER, 1984, 3,212 SITE . <br /> INSPECTIONS HAVE BEEN CONDUCTED, REPRESENTING AN INCREASE <br /> • OF 81% ABOVE PROJECTED LEVELS'. FOR GRADING WORK, PERMITS <br /> ARE ABOUT 25% BELOW PROJECTIONS WITH 19 ISSUED, WHILE <br /> SITE PLAN REVIEWS ARE RIGHT AT ANTICIPATED LEVELS WITH 20 <br /> CONDUCTED. <br /> 3. PLANNING <br /> ELEMENTS OF BOTH THE COMPREHENSIVE AND CURRENT PLANNING <br /> 'DIVISIONS WERE COMBINED IN THE 1984-85 WORK PROGRAM. <br /> OBJECTIVES AND ACCOMPLISHMENTS WITHIN THE PLANNING <br /> - DIVISIONS ARE AS FOLLOWS: <br /> (A) A MAJOR RESPONSIBILITY OF THE PLANNING DIVISIONS • <br /> IS TO PREPARE AGENDA MATERIALS FOR MEETINGS OF THEW <br /> PLANNING BOARD, BOARD OF COMMISSIONERS, BOARD OF <br /> ADJUSTMENT AND NUMEROUS ADVISORY GROUPS. PREPARATION <br /> FOR 131 MEETINGS WAS PROJECTED IN 1984-85, WHILE ONLY <br /> 42 (32%) OF THE PROJECTED MEETINGS WERE HANDLED. <br /> WITH THE INITIATION OF WORK ON THE JOINT PLANNING <br /> AREA PLAN AND THE ACTIVATION OF PLANNING BOARD ' <br /> . SUBCOMMITTEES, THE PROJECTION OF 131 MEETINGS WILL BE <br /> REACHED BEFORE THE 1984-85 YEAR IS COMPLETED. <br /> (B) ANOTHER IMPORTANT FUNCTION IS PROCESSING AND <br /> PREPARING RECOMMENDATIONS ON DEVELOPMENT <br /> APPLICATIONS, INCLUDING PLANNED DEVELOPMENTS, <br /> REZONINGS, SPECIAL USE PERMITS, LAND USE PLAN <br /> AMENDMENTS, AREA STUDIES AND SUBDIVISION PLATS. A <br /> 'TOTAL OF 182 APPLICATIONS WERE PROJECTED, AND 110 <br /> HAVE BEEN PROCESSED. THIS IS 10% ABOVE 1984-85 <br /> • <br /> PROJECTIONS. <br /> (C) ANOTHER ELEMENT PROJECTED WAS THE PREPARATION <br /> OF EIGHT (8) AREA PLANS. THREE (3) PLANS HAVE BEEN <br /> INITIATED, INCLUDING THE JOINT PLANNING AREA PLAN, i <br /> THE UNIVERSITY LAKE WATERSHED STUDY, AND THE CANE <br /> .CREEK WATERSHED STUDY. ALL THREE OF THESE PLANS ARE <br /> PROJECTED . FOR COMPLETION AND PUBLIC HEARING BY JUNE, <br /> 1985. <br /> TWO OTHER AREA PLANS, THE HOMESTEAD ROAD AREA STUDY <br /> AND THE I-40/NEW HOPE ROAD INTERCHANGE STUDY, ARE <br />
The URL can be used to link to this page
Your browser does not support the video tag.