Browse
Search
Agenda - 02-25-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 02-25-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 12:12:14 PM
Creation date
9/8/2016 1:35:49 PM
Metadata
Fields
Template:
BOCC
Date
2/25/1985
Meeting Type
Public Hearing
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 091• <br /> • • <br /> 2) Proposed hours and days of operations. <br /> 3) Estimated type and volume of extraction. <br /> 4) Description of method of operation, including the <br /> disposition of topsoil, overburden and by-products. <br /> 5) Methods to control and respond to spillage of extracted <br /> materials, overburden or by-products and vehicular mud <br /> on off-site roads . <br /> 6) Description of equipment to be used in the extraction <br /> process. <br /> • <br /> 7) Methods to prevent pollution of surface and ground water. <br /> 8) Operational test wells and schedule of results and <br /> analysis and response. <br /> 9.) Compliance with provisions of Sediment and Erosion <br /> Control Ordinance. <br /> • <br /> 10) Depth of extractive operations. <br /> 11) Any phasing of the operation and the relationship among <br /> the various pbases. <br /> • <br /> 12) Operating practices will be followed to comply with the <br /> • performance standards applicable to the operation (.See <br /> Subsection 8. 2) . <br /> c) A Rehabilitation Plan which shall include: <br /> 1) A statement of planned rehabilitation of the excavated <br /> • land, including detailed methods of accomplishment and <br /> planned future use of the rehabilitated land. <br /> • 2) A.map showing the final topography, after. rehabilitation, <br /> to the same scale as the Site Plan, depiCting any water <br /> areas' and methods of preventing stagnation and pollution <br /> thereof., landscaping and ground cover. proposed to 'be <br /> installed, and the amount and type of back fill to be <br /> employed, if. any. <br /> 8). Typical cross-sections, showing planned rehabilitation. • <br /> 4) A phasing and timing plan, related to the phasing and <br /> timing portion of the Operations Plan, showing the <br /> progression of the rehabilitation and the date when it <br /> will be complete. <br /> 5) The method of disposing of all equipment, structures, <br /> .dikes and spoil piles associated with the operations. • <br /> 6) A written legal description or survey of the property, <br /> • <br /> • <br /> . . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.