Orange County NC Website
09C <br /> , PROPOSED AilENDMENTS <br /> SECTION 8.8 .1 - EXTRACTION OF EARTH PRODUCTS (CLASS A SPECIAL USE) <br /> Proposed amendments or additions are highlighted in italics . <br /> 8 .8 .1 Extraction of Earth. Pkoducts (Class A Special Use) <br /> • <br /> 8.8.1.1 ' Additioral Information <br /> In addition to the information required by Subsection 8. 2, the <br /> following shall be submitted as part of the application. <br /> a) Seven copies of the site plan, prepared by a North Carolina <br /> • registered land surveyor or engineer, shall contain the <br /> • following: <br /> • 1) Extent of area to be excavated or mined. <br /> • <br /> 2) Aerial photograph of site and all areas within 1,000 <br /> feet of the perimeter of the property flown within two <br /> (2) months of the application for a Special Use Permit. <br /> 3) Existing topography at a contour interval of two - (2) <br /> feet based on mean sea level datum. <br /> 4) Land use, road system, natural features and topographical <br /> • (10 foot contourLintervals) details for the area within <br /> . 1,000 feet of the perimeter. of the property. <br /> • 5) Typical cross-sections showing extent of overburden, <br /> • extent of sand and gravel deposits, and water pable. • <br /> 6) Proposed handling and storage areas for overburden', by- <br /> products and excavated materials. • <br /> • • <br /> 7). Location and results of groundwater borings showing depth <br /> of groundwater. <br /> • <br /> • <br /> 8) Any areas proposed for ponding. • <br /> • <br /> 9) Wind pattern details and 'on-site windbreaks . <br /> '10) Soils details and statement addressing agricultural <br /> • productivity and reclamation'. <br /> • • • <br /> 11) Traffic impact analysis addressing the capacity of the <br /> • roads to serve the site. <br /> 12) Access roads to the site, as well as on-site roads, with <br /> indication of surface treatment to limit dust. Sight <br /> distances on all roads used for access to the site. <br /> • <br /> 13) Required setback areas, including screening/buffering. <br /> • existing and/or proposed. If plant materialS are to be • <br /> installed, the number, location, size and -type of plants <br /> are to be identified. • <br /> • <br /> • <br /> b) An Operations Plan which shall include: <br /> • <br /> • <br /> 1) The date proposed to commence operations and their <br /> • <br /> expected duration. <br /> • • <br /> belaiiiiimmommr - <br />