Browse
Search
Agenda - 02-25-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 02-25-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 12:12:14 PM
Creation date
9/8/2016 1:35:49 PM
Metadata
Fields
Template:
BOCC
Date
2/25/1985
Meeting Type
Public Hearing
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE $.2.4 SPECIFIC STANDARDSlALL SPECIAL USES ("Yes4' indicates compliance; "No` indicates noncompliance) <br /> Planning Staff U' <br /> .T <br /> Findings-Based on Planning Ordinanee. Requirements S-ubmi d Anolica ion _Evidence Submitted to SLrpport Findings <br /> Board <br /> Recommend -d Findings <br /> Article 8.2.4 requires the applicant <br /> to address the following- <br /> a) Method and adequacy of provision X Yes No Applicant indicates that the development ' Yes No <br /> for sewage disposal facilities, is to be served by individual on-�si:te <br /> solid waste and wafter service:: septic systems and by'four community <br /> well Staff recommends that :easements <br /> be designated on. the s 1 to *plan for each <br /> well site. <br /> Solid waste will be placed in individual <br /> trash cans at each home and collected by <br /> by- a private contractor. <br /> b) Method and adequacy *of police, ..X Yes _No Fire protection will be:provi ded by Yes No <br /> fire and rescue squad protec= the Eno Rural Fire Department, rescue _._._. <br /> Lion service by the Orange- Rescue Service, <br /> and police protection by the Orange <br /> -County Sheriff's Department. ( See <br /> ::attached correspondence). <br /> C) Method and adequacy. of vehicle X Yes No The Orange County Planning Staff- _Yes No <br /> access to the site and traffic has projected 1.73 vehicle trips - <br /> condifii.ons around the site per' day from.the site. This projection <br /> is based on 32 proposed dweLling units <br /> times 5.4 vehicle trips per dwelling <br /> per -day <br /> The 1532 average daily traffic count at <br /> Umstead Road is 1 ,200 ADT. DOT* i-n Durh.am <br /> County estimates traffic at_ this point on <br /> Craig Road at 500.;700 ADT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.