Orange County NC Website
i <br /> , . f <br /> ' <br /> , <br /> . .. ' <br /> IV. Pedestrian Path (32,400 Ft 2 satisfactory) (Expand conceptually for <br /> • - <br /> jogging and leisure walking) • <br /> .-, <br /> A. Park construction materials will be primary consideration for <br /> function, maintenance and overall economics. <br /> 1. Shale Composition - Rock Dust is currently being used successfully. :t <br /> Once compacted it possesses a more than ample moisture absorption ; c <br /> rate; washing is not a problem. It is extremely white-in color <br /> when dry - (Cost = 12 yd tandem delivered: $135.00; picked-up - <br /> $70.00) . <br /> • 2. Additional pathing will be required in the future for <br /> utilization of the open-space and natural area. <br /> -.:. <br /> V. Open Space. (238,375 Ft 2 satisfactory) e• 1 <br /> '•• <br /> 1 . <br /> • ,, <br /> Project is satisfactory. Primary Recommendation: Tot Lot and basketball <br /> court areas should be properly fenced for participant safety (chained-linked, <br /> 31' i <br /> 9 gauge hot dipped galvanized materials w/Schedule-40 poles should be <br /> Yi <br /> ! . recognized for both areas; Height = minimum 6 foot - Tot Lot; minimum 10' - $ <br /> : Basketball Court. Further specs and costs can be provided by contacting - <br /> -, <br /> staff. <br /> •..0 <br /> RWW/pbl <br /> . P <br /> ; . <br /> . r•,: <br /> . . <br /> {e <br /> 1 . <br /> . . . <br /> 1:1'1 <br /> . . <br /> ..i'' <br /> . . • <br /> q•-,• <br /> :.• <br /> . . <br /> 4 <br /> . <br /> . . <br /> • <br /> f t. <br /> . , <br /> Z-1. . <br /> ..1.• . <br /> • 41 <br /> . . <br /> Iv <br /> 5 .. <br /> ..,. <br /> r. <br /> . . <br /> , . <br /> . . <br /> . . <br /> W. <br />