Orange County NC Website
UtiS <br /> •' ,+,,•Motion was made by Commissioner Marshall, seconded by Chair Willhoit <br /> thwt;; the public hearing be continued to January 7, 1904 to receive the 1 <br /> Planning Board's recommendation. <br /> VOTE: UNANItOUS. <br /> 7. QhISP,AT.F_Mg.!(2-1y.1 NNED DFVELRL'A:ENT/SP CTRL USE PERMIT An,.PL1C11ZI.42l <br /> . S17OR11 IN: Doris Huckabee, Rodney Turner, Steve Medlin, Ricky Smith, <br /> Crank Williams, . Phil Post, Roger Dale Stephens, Evelyn Poole-Kober, and <br /> Marvin <br /> Collins. <br /> Marvin Collins made the staff presentation. Na cited the receipt of a <br /> letter from Marvin T. Glenn in opposition of the proposal. The purpose of <br /> this item 1s to receive public comment on a proposed Planned Develop- <br /> ment/Special Use Permit application for 52.70 acres of land located west of <br /> NC 8 and east of the Interstate 40 corridor. The purpose of the request is <br /> to permit the construction of a 57 unit mobile home park on lots 13 and 23 of <br /> map 49 in, Hillsborough Township. The present zoning classification of the <br /> property is R-1 Residential; while the requested designation is PD-H-Ri. The <br /> property is located in a Rural Residential area as designated on the Orange <br /> County Land Use Plan. That designation permits single-family residential <br /> housing. Certain development standards must be met and a Special Use Permit <br /> obtained to cluster the mobile home units on the property. <br /> The Planning Staff recommends approval of the request subject to the <br /> following conditions: . <br /> ' 1. The grantee of this Special Use Permit shall post with Orange <br /> • County, in a form acceptable to the County Attorney, a bond or <br /> letter of'credit in an amount equal to the cost of all improve- <br /> ments plus 10%. The amount shall be determined on the basis of <br /> fully executed construction contracts or certification by a . <br /> registered engineer employed by the grantee of this Special Use <br /> Permit. Security for construction of the improvements in this <br /> project may follow phasing in the project. ' Specifically, as <br /> improvements are completed in each phase that phase and.a cor- <br /> responding amount of money may be released from the security <br /> instruments or the security instruments may be rdnegotiated <br /> based on the "yet to do' portion of the improvements. <br /> • 2. Security shall be provided for the grading, paving and stabili- <br /> zation of all cleared areas, streets and other vehicular travel <br /> .ways; sidewalks and other pedestrian walkways, erection of <br /> street signs; utility installation and hookups and "tot lot"; <br /> landscaping and mulching around,all mobile home units, • <br /> 3. All necessary easements to permit utility (electricity, tele- <br /> phone and cable television by any cable television provider <br /> franchised by Orange County' to serve this development) <br /> • installation, servicing and hookups to the development and to • <br /> each unit within the devopment shall be provided at no cost to <br /> the utility provider. <br /> 4. 'Roads, parking areas, walkways, street signs, utilities, recrea- <br /> • tion facilities and sites, landscaping and mulching around units <br /> shall be maintained as constructed. All such improvements and <br /> • <br /> • <br /> • • <br /> • <br /> • <br />