Orange County NC Website
_ ~^ _ <br /> ~ <br /> . ^ -2- � January 22, 1985 <br /> MEMO TO MAKVUH COLLINS FROM SUSAN SMITH 045 <br /> ` CONCERNING EXTRACTIVE USE REGULATIONS ` <br /> (4) a PY }oaLlonsmust <br /> satisfy both general and specific <br /> standards ds o <br /> f evaluatipn, as well as all other• requirements of the Zoning Ordinance for the district in which located, incl d/ng dimensional <br /> al standar6s, signage, parking and loading and land oap/»g^ Where an overlay district applies, the standards of that district must also be satisfied, <br /> ' ^ <br /> Under the provisions of the Ordinance any informational material <br /> necessary to make a determination may be required. . s reasonably <br /> In reviewing informational materials on extractive use regulation, the following <br /> P. <br /> areas for possible amendment to the Zoning Ordinance are suggested: <br /> Ft (1) limit extractive uses as permitted uses u nd <br /> • all other Prmcass to yndust�yal �gr��u}�ur���R�s7d�n�orla special use permit <br /> districts and prohibit them in ll th /a and Residential-1 <br /> o <br /> and watershed districts; <br /> residential, commercial <br /> (2) include the folf.r.,vinQ site plan requirements: <br /> a. aerial photograph of -the site and all areas within 1000' of the <br /> perimeter of the property flown within two (2) months of the <br /> application for a special use permit <br /> b. land use, road system, natural features and topographical <br /> (10' contours) details for the area within 1000` of the l <br /> of the property� � per meter <br /> c. location and results of groundwater borings showing depth of <br /> groundwater <br /> d. wind pattern details and on-site wind breaks <br /> e. typical cross-section showing <br /> sand and gravel deposits and the water table <br /> ow n� axt�nt of overburden, extent o <br /> opoy �s of <br /> grav� <br /> f. soils details and statement addressing agricultural productivity:: <br /> and reclamation efforts <br /> ') ' <br /> g^ traffic impact analysis addressing the capacity of road s serving site; <br /> (3) include the following Operations Plan requirements: <br /> a. methods to prevent pollution ofsurfact and groundwater <br /> b. operational test wells and schedule of results analysis and response <br /> c, compliance with the provisions of the Sedimentation and £ � <br /> Control Ordinance <br /> '' Erosion <br /> d. methods to control and respond to spillage of extracted material <br /> . . <br /> overburden or byproducts and vehicular mud on off-site roads s^ <br /> e. depth of extractive operation; <br />