Browse
Search
Agenda - 02-04-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 02-04-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 11:48:43 AM
Creation date
9/8/2016 12:09:55 PM
Metadata
Fields
Template:
BOCC
Date
2/4/1985
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
011 <br /> Mr. Kenneth R. Thompson <br /> January 15, 1985 <br /> • , Page 6 • <br /> cost estimate. This estimate will be furnished to the <br /> County for establishing a construction budget: <br /> 5. Final Review and Approval <br /> Hazen and Sawyer will review the final contract <br /> documents with members of the County staff . Upon <br /> approval by the County, Hazen and Saywer will assist <br /> the County in securing the required regulatory <br /> approvals by participating in the submissions and <br /> discussions with the appropriate authorities. <br /> 6. Assistance in Securing Construction Bids <br /> • <br /> Hazen and Sawyer will provide contract documents for <br /> the purposes of soliciting price proposals from <br /> qualified contractors for the proposed sewer line <br /> construction. Bids received will be analyzed and a <br /> recommendation for award of construction contracts will <br /> be made. <br /> • <br /> During the construction phase, Hazen and Saywer will provide <br /> Construction Engineering Services in accordance with the County' s <br /> •. request for proposals . General administration of the <br /> • construction contact will include review and approval of shop <br /> drawings , approval of contractor payment request and preparation <br /> of change order, if required. Upon completion of the project , <br /> Hazen and Sawyer will certify substantial completion and furnish <br /> the County a reproducible set of "As Built" drawings. <br /> . Hazen and Sawyer will also provide a qualified project <br /> representative to monitor the daily construction activities . <br /> Generally, a full-time project representative is desirable for <br /> gravity sewer construction, although less intensive supervision <br /> can be provided if desired by the County. The project <br /> • representative working in combination with general supervision by <br /> our project manager will insure that construction is conducted in <br /> accordance with the contract documents . <br /> Client References <br /> Hazen and Sawyer takes pride in the fact that 70% of our <br /> business is derived from repeat clients. We feel our continued <br /> service to many clients is the best indicator of our capability <br /> to perform on important projects such as the sewer improvements <br /> proposed for Cheeks Township . Since we have never had the <br /> • <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.