Orange County NC Website
• <br /> 010• <br /> • I Mr. Kenneth R. Thompson <br /> January 15, 1985 <br /> Page 5 <br /> : 1 <br /> • <br /> ' • <br /> The initial effort will be directed to establishing a <br /> pplIpinary_plan and....pr.pf.i.le along the proposed route . <br /> Preliminary drawings will be Prepared and a tentative <br /> 1 <br /> horizontal grade established . excessive <br /> excavation willbe_identtfted_and_evaluations made as <br /> -. • . <br /> to field adjustments of th.e_aligmment to mislimize <br /> required excavation. Additional field surveys wfir—6e <br /> Ilia71-4—Wherehe-66sSary to establish final plan and <br /> Easement acquisition surveys will be made based on the <br /> final sewer alignment. Easement maps will be prepared <br /> in accordance with the requirements of the Orange <br /> ' County Register of Deeds. Upon approval of the maps by <br /> the County staff , Hazen and Sawyer will furnish maps <br /> suitable for recordation by the County. <br /> 2. Subsurface Investigation • <br /> Once the final pipeline alignment is established, a <br /> subsurface_investlgatientoifigatify the extent of rock <br /> excavation is recommended. Where_pos_sibfeaxs <br /> alignment will be_ Dad e_t_o <br /> minimize roa_axc_ailEIOn . Knowl4dye—of the rock <br /> excavatran quantities will permit more accurate <br /> estimates of the construction costs. <br /> 3. Preparation of Contract Documents • <br /> .11 Important aspects of the pipeline design will include <br /> finalizing the pipe alignment , selection of pipe <br /> materials and pipe beddings and d-A= lopment of <br /> material specifications. Plan and •rorl- irawin. s at <br /> rul • a horizontal scale of 4_QQr5Ofet pr inch will be <br /> prepared. Other scales can boused . i.L. desired by the <br /> County staff . Teennica specifications will be <br /> prepared that addresrititsal construction materials , <br /> minimum cwtructiostandar.ds , specialized <br /> constructio techniques and final restoration of <br /> disturbed areas . Bid documents will be prepared as <br /> necessary for soliciting construction bids. <br /> 4. Final Construction Cost Estimate <br /> ased on the final. desigrLdrawingsand specifications, <br /> Hazen an —Baywer will prepare a detailed consjLructAon. <br /> • <br />