Orange County NC Website
007 <br /> _ . <br /> I Mr. Kenneth R. Thompson <br /> January 15, 1985 <br /> ., ., Page 2 • . ., <br /> 1 <br /> - <br /> . . <br /> 1 <br /> A design and construction administration for water, wastewater, and <br /> . drainage projects whose aggregate construction costs now <br /> approach $65 million. <br /> . <br /> The Raleigh office has direct and related experience on <br /> 1 several projects very similar to the proposed sewer improvements <br /> for Cheeks Township . Summary descriptions of several example <br /> - A <br /> projects are included as Attachment 1 to our proposal . <br /> Attachment 2 is a firmwide brochure which provides further <br /> background information about the firm. <br /> ' 1 Project Personnel <br /> • <br /> , Hazen and Sawyer is particularly qualified to undertake <br /> design and construction administration of the proposed sewer <br /> A, improvements for Cheeks Township. The firm has successfully <br /> completed or is actively working on projects of similar scope <br /> . with comparable financial arrangements. Design and contract • <br /> administration will be assigned to senior engineering personnel <br /> in the Raleigh .office with in-depth experience in heavy utility <br /> , . . <br /> design and construction. Resumes of those persons to be involved <br /> with this .project, Raleigh office personnel list, and a proposed <br /> ; 1 organizational chart indicating various team members and their <br /> A <br /> responsibilities are included as Attachment 3 to our proposal. <br /> . ,1 <br /> The project will be conducted under the overall direction of <br /> Mr. Donald L. Cordell" P.E. , as roject manager, responsible for. • <br /> Chse-----dvera11 technica performance and administration of the <br /> project . Mr . Cordell has been responsible for design and <br /> A construction administration of water and sewer projects in • <br /> Greensboro, Raleigh , Garner, Holly Springs, Spring Hope , Chapel <br /> Hill , and Warrenton, North Carolina totaling in excess of 200,000 <br /> feet and ranging in size from 4-inch to 54-inch pipe . The <br /> projects in Garner and Spring Hope, North Carolina each included <br /> sewer extensions into previously unsewered areas requiring a <br /> 1 combination of gravity sewers, force mains, and pumping station. <br /> In Holly Springs, North Carolina, Mr. Cordell is managing design <br /> of a complete wastewater collection and treatment system <br /> including some 60,000 feet of gravity sewer , two pump stations <br /> 1 <br /> ..1 and a package treatment plant. <br /> Mr . Kevin F . Carter , P. E . , will serve as projecteagineer <br /> _- <br /> responsible for—keparation of the detailed design and conEr—a-Fe <br /> documents . Mr. Carter served as resident project representative <br /> for water and sewer projects in Charleston, South Carolina , and <br /> for the Bermuda Center Sanitary District in Winston Salem, North <br /> I <br /> .,1 <br /> . <br />