Orange County NC Website
_ <br /> 0 O <br /> Form FmHA-NC 1942-19 <br /> December 1, 1984 <br /> UNITED STATES DEPARTMENT OF AGRICULTURE <br /> FARMERS HOME ADMINISTRATION <br /> ATTACHMENT I to FORM FmHA 1942-19 <br /> MEDIAN FEES FOR PROFESSIONAL <br /> ENGINEERING SERVICES <br /> AS A PERCENTAGE OF NET CONSTRUCTION COST <br /> NORTH CAROLINA <br /> The fees are to be adjusted to suit special conditions stated in the <br /> contract. <br /> Table I fee schedule may be used for that portion of a construction <br /> .project which is unusually complex such as a water treatment lant (surface <br /> plant <br /> or ground water), wastewater treatment e <br /> interceptor lines, water or wastewater , wastewater collection and <br /> in place clear wells, intake structures, an of <br /> treatment facility, and appurtenant work to above <br /> (electrical, HVAC, .etc.). <br /> Table II ordinarily will apply to all other design work such as water <br /> lines, wells, minor water treatment facilities <br /> tanks and foundations, and manufacturer or contractor Zdesignedn clear ewellsed <br /> (metal or concrete). <br /> ' All construction contracts within each table grouping will be totaled <br /> prior to applying the fee percentages. <br /> Table I Table II Table III <br /> Total Actual % % <br /> Construction Cost Fee <br /> 100 000 Fee Fee <br /> 10.3 g 0 <br /> 200,000 9.3 7.9 <br /> 300,000 8.7 6.0 <br /> 7.5 <br /> 400,000 8.4 . <br /> 500,000 6.9 2 4 4.2 5 <br /> 600,000 8.0 6.9 7.8 <br /> 6.7 4.0 <br /> 700,000 7.6 <br /> V 6.5 3.8 <br /> 800,000 <br /> 7.4 6.4 3.7 <br /> 900,000 7.3 6.3 <br /> 1,000,000 7.2 3.5 5.8 2.4 <br /> 2,000,000 6.7 <br /> 5.8 2.5 <br /> 6.4 5.5 2.1 <br /> 3,000,000 1 <br /> 4,000,000 <br /> 6.2 5.2 1.9 <br /> 5,000,000 5.9 5.0 <br /> 10,000,000 5.7 1.7 <br /> 4 1.5 <br /> S.6 4'7 7 <br /> 15,000,000 . <br /> 20,000,000 . 1.4 1. <br /> 5.5 4.6 1.3 <br /> The fee for project costs falling between the figures shown in above <br /> tables shall be interpolated to nearest one-hundredth of one percent. <br /> Compensation may be negotiated on a lump-sum basis for all projects <br /> costing $100,000 or less. <br />