Browse
Search
Agenda - 01-07-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 01-07-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 11:36:50 AM
Creation date
9/8/2016 11:22:58 AM
Metadata
Fields
Template:
BOCC
Date
1/7/1985
Meeting Type
Public Hearing
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> ART[CLE 9 - .- <br /> BASIS OF COMPENSATION <br /> • <br /> The Owner shall compensate the Architect for the Services provided, in accordance with Article 4, Payments to a :.• <br /> Architect,and the other Terms and Conditions of this Agreement,as follows: <br /> 9.1 AN INITIAL PAYMENT OF dollars ($ <br /> shall be made upon execution of this Agreement and credited to the Owner's account as follows: <br /> 9.2 BASIC COMPENSATION — A fixed, not—to—exceed amount of $;1,500 for engineering <br /> services for preparation of detailed plans, specifications and Yid documents <br /> and for inspections while the project is under construction. <br /> 9.2.1 FOR BASIC SERVICES, as described in Paragraphs 1.1 through 1.4 or identified as such In Article 10,Basic Corn- <br /> - pensation shall be computed as follows: <br /> (Here insert basis of compensation,including fixed amounts,multiples or percentages, and identify Phases to whidt particular methods of com- <br /> pensation apply,if necessary.) <br /> 9.2.2 Where compensation is based on a Stipulated Sum or Percentage of Construction Cost, payments for Basic Ser- <br /> vices shall be made as provided in Subparagraph 4.2 so that Basic Compensation for each Phase shall equal the <br /> following percentages of the total Compensation payable: <br /> • (include any additional phases as appropriate.) • <br /> • <br /> Design Phase: thirty—five percent.[35%) <br /> Construction Documents Phase: • forty percent(10%) <br /> Bidding br Negotiation Phase; percent( %) <br /> Construction Phase: .� —twenty—five percent 5%► <br /> 9.3 FOR ADDITIONAL SERVICES provided under Paragraph 1.5 or identified as such in Article 10, compensation <br /> shall be computed as follows: Two hundred dollars in expense allowance for attendance <br /> at meetings; and printing and photocopy cost to be billed the County at a rate <br /> of $.65 per sheet for blueprints and $.l0 per page on all copies. See Article 10. <br /> • <br /> (Here insert basis of compensation,including rates and/or multiples of Direct Personnel Expense for Principals, consultants and employees. Iden- <br /> tify specific types of consultants in Article 10,if required.) <br /> 9.4 Payments due the Architect and unpaid under this Agreement shall bear interest from the date payment is due <br /> at the rate entered below, or in the absence thereof, at the legal rate prevailing at the principal place of busk <br /> ness of the Architect. <br /> (Here insert any rate of interest agreed upon.) - <br /> (Usury laws and requirements under the federal Truth in tending Act,similar state and local corsumer credit laws and other regulations at the <br /> Owner's and Architect's principal places of business, the location of the Project'and elsewhere may affect the validity of this provision. Specific <br /> legal advice should be obtained with respect to deletion, modification, or other requirements such as written disclosures <br /> °-- �.._ - 4- -- or waivers.) <br /> 9.5 The Owner and the Architect agree in accordance with the Terms and Conditions of this Agreement that: <br /> Plans specifications and bid documents shall be completed within 45 calendar days <br /> of the signing of this agreement. Delay beyond 45 days caused by the Architect <br /> will result in Architect's compensation being reduced by a sum of $50 per <br /> calendar day--after the forty-five day limit--that the final plans, specifications <br /> and contract documents are not completed and submitted for approval to the County. <br /> 9.5.1 IF THE SCOPE of the Project or of the Architect's Services is changed materially,the amounts of compensation <br /> shall be equitably adjusted. <br /> 9.5.2 IF THE SERVICES covered by this Agreement have not been completed within <br /> of the date hereof, through no fault of the Architect, the amounts of compensation, rates and(multiples nset s <br /> forth herein shall be equitably adjusted. <br /> MA DOCUMENT 6151 • ABBREVIATED OWNER-ARCHITECT AGREEMEN <br /> 0 7978• THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVENUE, N.W.,,IUNE WASHINGTON, D.C. 00(IS <br /> B151-1978 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.